Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberPLM16-00033
StatusFinaled
Name DEBEST PLUMBING INC
Site Address 400 S CAPITOL BLVD
Project Name 
Customer Number15-60
ePlanReviewNo
Description
New: waste/vent piping, domestic water piping, rain leaders/drains, plumbing fixtures
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/26/201710/27/201710/27/2017APASS
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Final10/5/201710/6/201710/6/2017PPART
DetailsDaryl Spivey
Re-inspect floors 1-4 FINAL, Final for 9th floor. If questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
tco ok.....floors 2-9 complete.........still need funnel drain, open w/c seat, insulation on piping and 10th floor.......also open up cabinet for floor sink.........ds
Final9/20/20179/21/20179/21/2017APART
DetailsBill VanDegrift
Final for floors 1st -4th, if you have any questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
1) provide funnel for floor drains receiving condensate drainage.
2) open up cabinet at floor sink in food prep area.
3) open front seats required on public toilets.
4) hook up all equipment.
5) remove splitter at mop sink faucett for chemical station.
6) provide shutoff valves for clothes washers.
7) Ice bin drains at all ice machines may not be connected to other drains.
8) caulk mop sinks
9) expose condensate terminations in planters on 2nd floor.
10) complete insulation of exposed piping.
11) install pool room rp drip cup drains.
12) install 2nd floor booster pump relief lines.
13) 1st floor mechanical room incomplete.
14) rooms 302, 325, 402, 405 and 408 incomplete.
Final9/5/20179/6/20179/6/2017APART
DetailsDaryl Spivey
Final for Floors 4th, 5th, 6th ; 7th. If questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
inspection was done on 5th, 6th, 7th and 8th floors.......4 not ready.......5th, 7th and 8th plumbing done.......6th has 3 lav countertops missing. rooms 502, 602, 702 and 802 not finished. RP's need installed on ice machines with filters.........ds
Plumbing Rough-in7/13/20177/14/20177/14/2017PCANC
DetailsDaryl Spivey
If there are any questions please contact Larry Johnstone at ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Plumbing Rough-in4/19/20174/20/20174/20/2017APART
DetailsDaryl Spivey
9th ; 10th Floor, if questions call larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
water ok on 9th and 10th floors west side.............ds
Plumbing Rough-in4/19/20174/20/20174/19/2017ACANC
DetailsDaryl Spivey
if questions call Chad @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Plumbing Rough-in4/18/20174/19/20174/19/2017PPART
DetailsDaryl Spivey
Rough-In Water 9th ; 10th Floors. If questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
water on 9th and 10th floors east side ok........ds
Plumbing Rough-in4/13/20174/14/20174/14/2017PPART
DetailsDaryl Spivey
If you have any questions please call Larry Johnstone ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
9th and 10th floor west side waste and vent tested ok............ds
Plumbing Rough-in4/12/20174/13/20174/13/2017APART
DetailsDan Ediger
If there are any questions please contact Larry Johnstone ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. East side DWV floors 9 and 10 ok.
Plumbing Rough-in3/29/20173/29/20173/29/2017PPART
DetailsDaryl Spivey
1st floor water. If questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in3/13/20173/13/20173/13/2017PPART
DetailsDaryl Spivey
Rough-in 7th ; 8th floors. if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
water and roof drains tested 7th and 8th floors.............ds
Plumbing Rough-in3/10/20173/13/20173/13/2017ANR
DetailsDaryl Spivey
Rough-in 7th ; 8th floors. if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in3/10/20173/10/20173/10/2017PPART
DetailsDaryl Spivey
waste ; vent. If questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
W/V west side 7th and 8th floors ok............ds
Plumbing Rough-in3/8/20173/9/20173/9/2017APART
DetailsDaryl Spivey
7th ; 8th Floors - if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
W/V only east side ok..........ds
Other2/8/20172/9/20172/10/2017APART
DetailsBill VanDegrift
Conferance 10:00 AM ok
Plumbing Rough-in2/10/20172/10/20172/10/2017PPART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
6th floor water ok.............ds
Plumbing Rough-in2/9/20172/9/20172/9/2017APART
DetailsDaryl Spivey
Water r/i on 5th floor ok...........ds
Other2/8/20172/9/20172/9/2017APASS
DetailsDaryl Spivey
Conferance 10:00 AM
suds relief
Other2/8/20172/9/20172/9/2017ADONE
DetailsEric Strole
Conferance 10:00 AM-Conferance on suds relief.
Other2/8/20172/9/20172/8/2017ACANC
DetailsDan Ediger
Conferance 10:00 AM
Plumbing Rough-in2/7/20172/8/20172/8/2017APART
DetailsEric Strole
Larry Phone #: ###-####-5th and 6th flr west side pass.
Plumbing Rough-in2/2/20172/3/20172/3/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
5th and 6th floors waste and vent tested as marked on plans..........ds
Plumbing Rough-in2/1/20172/2/20172/2/2017ACANC
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Plumbing Rough-in1/31/20172/1/20172/1/2017PCANC
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann Inspection cancelled from web by: Stacia Haumann
Plumbing Rough-in1/25/20171/26/20171/26/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
partial 1st floor waste and vent.........ds
Plumbing Rough-in1/23/20171/23/20171/23/2017PPART
DetailsDaryl Spivey
if questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
as marked on plans.............ds
Plumbing Rough-in1/17/20171/18/20171/18/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
3rd floor water........needs more support in several places............ds
Plumbing Rough-in1/16/20171/17/20171/17/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
water on 3rd floor partial.............ds
Plumbing Rough-in1/11/20171/11/20171/11/2017PPART
DetailsDaryl Spivey
if questions call larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
All rooms ok except 314, 406, 410, 413, 417 and 431..........ds
Plumbing Rough-in1/9/20171/9/20171/9/2017PCANC
DetailsDaryl Spivey
If questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in1/6/20171/9/20171/9/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
1st floor main up to 4th floor waste and vent.........ds
Plumbing Rough-in1/5/20171/6/20171/6/2017APART
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
as marked on plans...........ds
Plumbing Rough-in12/29/201612/30/201612/30/2016APART
DetailsEric Strole
Test on dwv 3rd and 4th flr west side of corridor except end units both flrs both sides and 3rd flr laundry pass.
Plumbing Rough-in12/27/201612/29/201612/29/2016APART
DetailsEric Strole
if questions call Larry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-3rd and 4th flr east side of corridor dwv pass.
Plumbing Rough-in12/27/201612/27/201612/27/2016PNR
DetailsDaryl Spivey
if questions call Larry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
PLM-Aging Inspection10/19/201610/19/201610/19/2016 PEND
DetailsDaryl Spivey
wip
PLM-Aging Inspection7/20/20167/20/20167/20/2016 PART
DetailsEric Strole
wip
Groundwork4/20/20164/21/20164/21/2016PPART
DetailsDaryl Spivey
if questions call Chad ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
as marked on plans..........ds
Groundwork4/18/20164/18/20164/18/2016PPART
DetailsJim Little
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
>level 1 public restroom gw ok
>level 1 bar and kit grease ok



.
Groundwork4/14/20164/14/20164/14/2016PPART
DetailsDaryl Spivey
Please Call Mike Chapman @ ###-#### with any questions.
Thank You - Holly Grago. Phone #: ###-#### Inspection requested via web by Stacia Haumann
water service and grease line partial ok..........ds
Groundwork4/11/20164/12/20164/12/2016APART
DetailsDaryl Spivey
Groundwork Partial
any questions please call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
as marked on plans...ds
Groundwork4/1/20164/1/20164/1/2016PPART
DetailsDaryl Spivey
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
partial on elevator drain...........ds
Groundwork3/14/20163/15/20163/15/2016APASS
DetailsJim Little
if questions call Chad at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
>next grid sec ok, marked on plans
Groundwork3/4/20163/7/20163/7/2016APASS
DetailsJim Little
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
>10" rd ok sw corner
Groundwork3/4/20163/4/20163/4/2016PNR
DetailsJim Little
if questions call Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
>NR but ok'd Chad to stub 10" 90 out fnd wall for storm drain and partially bury, to be under test and inspected monday and must match App plans.
Groundwork3/2/20163/2/20163/2/2016PPEND
DetailsEric Strole
Partial GW. If questions call Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-Need approved plans on site. Per Bill section complete needs to match approved plans. Told plumber need to have approved plans on site before they call in for any other inspections.
Groundwork2/26/20162/29/20162/29/2016PPART
DetailsJim Little
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
>garage drains from SOG-7 grid line ok level 1
>need approved plans onsite before further inspections are completed.
Groundwork2/5/20162/8/20162/8/2016APASS
DetailsDaryl Spivey
24 hr test on G/I. Chad
Groundwork2/4/20162/5/20162/5/2016APART
DetailsDaryl Spivey
Partial Ground Work for Grease Trap Phone #: ###-#### Inspection requested via web by Stacia Haumann
24 hr test start on G/I and piping out of G/I ok..........ds
Groundwork1/18/20161/19/20161/19/2016APART
DetailsDaryl Spivey
partial U/G - Interceptor Tie In. If questions call Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
24 hr test on tank ok and waste and vent lines tested ok...........ds
Groundwork1/6/20161/7/20161/7/2016PPART
DetailsDaryl Spivey
Ben
24 hr test complete on S and O int......ds
Groundwork1/6/20161/6/20161/6/2016PPART
DetailsDaryl Spivey
plumbing underground. Sand/Oil separator. If questions please contact Ben @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
start 24 hr test on Sand and Oil interceptor.........ds