Permit Information
Permit NumberPLM16-03057
StatusFinaled
Name UTAH MECHANICAL CONTRACTORS INC
Site Address 2972 E PARKCENTER BLVD
Project NameArboretum at Barber Station #2
Customer Number 
ePlanReviewNo
Description
New multi family-this permit is for the residential part of the BLDG-for the commercial sid eof this building-there needs to be a serperate permit pulled // Permit swapped from Building 2 to building 1 as requested by Insp. 380 5/18/17. APplicant called in inspections under wrong PLM permit number //C_P
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/23/20181/23/20181/23/2018PPASS
DetailsEric Strole
Unit 201. Roof drain covers Phone #: ###-#### Inspection requested via web by wes Ritchie
Final11/29/201711/29/201711/29/2017PPART
DetailsEric Strole
Temp final ok. Unit 201 needs complete & need 2 baskets on roof drains.
Final11/29/201711/29/201711/29/2017PCANC
DetailsEric Strole
411-201 threw 220 Phone #: ###-#### Inspection requested via web by wes Ritchie
Final11/27/201711/27/201711/27/2017APART
DetailsEric Strole
311 threw 320
411-412-415-417-418 Phone #: ###-#### Inspection requested via web by wes Ritchie-Units 311 thru 320, 412, 415, 417 & 418 pass.
Final11/24/201711/24/201711/24/2017PPART
DetailsEric Strole
10-units on 5th 510-520
19-units on 4th 401-420 minus 411
18- units on 3rd 301-320 Minus 311 Phone #: ###-#### Inspection requested via web by wes Ritchie-Units 301 thru 310, 401 thru 409, 410, 413, 414, 416, 419, 420, 510 thru 520 pass.
Final11/8/201711/9/201711/9/2017APART
DetailsEric Strole
501 to 510 tower one floor five Phone #: ###-#### Inspection requested via web by wes Ritchie-Units 501 thru 510 pass.
Other10/5/201710/5/201710/5/2017APART
DetailsBill VanDegrift
Main water line building 2 Phone #: ###-#### Inspection requested via web by wes Ritchie water is on
Other8/22/20178/22/20178/22/2017PPART
DetailsEric Strole
Water heater vents second floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 212, 213, 214 & 220 pass.
Other8/21/20178/21/20178/21/2017PPART
DetailsEric Strole
Water heater vents Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 211 thru 216 pass.
Other8/15/20178/16/20178/16/2017APART
DetailsEric Strole
4-water heater vents on third floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 312, 314, 316 & 318 pass.
Other8/15/20178/15/20178/15/2017APART
DetailsEric Strole
Water heater vents on third floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 311, 313, 315, 317, 319 & 320 pass.
Other8/3/20178/3/20178/3/2017PPART
DetailsEric Strole
4-water heater vents on fourth floor Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on water heater flues in units 415, 418, 419 & 420 pass.
Other7/31/20177/31/20177/31/2017PPASS
DetailsBen Livingston
Water heaters vents fourth floor Phone #: ###-#### Inspection requested via web by wes Ritchie
5lb flue rooms 411,412,413,414,416,417
Other7/24/20177/24/20177/24/2017PPART
DetailsEric Strole
Water heater vents 5th floor Phone #: ###-#### Inspection requested via web by wes Ritchie-test on w/h flues in units 511, 512 & 518 pass
Other7/20/20177/20/20177/20/2017PPART
DetailsEric Strole
Water heater vents Phone #: ###-#### Inspection requested via web by wes Ritchie-Test on w/h flues units 513 thru 519 pass.
Other6/28/20176/29/20176/29/2017APART
DetailsEric Strole
203 204 water heater vents Inspection requested via web by wes Ritchie-Water heater flues units 203 & 204 pass.
Other6/19/20176/20/20176/20/2017PPART
DetailsEric Strole
Water heater vents Inspection requested via web by wes Ritchie-Test on water heater flues in units 202, 205 & 206 pass.
Other6/19/20176/19/20176/19/2017APART
DetailsEric Strole
Water heater vents Inspection requested via web by wes RitchieTest on w/h flues in units 201, 207, 208, 209, 210 pass.
Plumbing Rough-in6/13/20176/13/20176/13/2017PPART
DetailsDaryl Spivey
Water pipe on fifth floor. Water heater vents on third floor Phone #: ###-#### Inspection requested via web by wes Ritchie
water heater vents rms 300, 302, 310 and 309 tested and water on 5th floor all tested ok...........ds
Roof Drains6/12/20176/12/20176/12/2017PPASS
DetailsDaryl Spivey
Roof and overflow drain Inspection requested via web by wes Ritchie
bld 2 roof drains tested ok..........ds
Roof Drains6/7/20176/8/20176/8/2017PPART
DetailsEric Strole
4throof drains and water heater vents Inspection requested via web by wes Ritchie-Test on water heater flues in rooms 302 thru 308 pass.
Plumbing Rough-in6/8/20176/8/20176/8/2017APART
DetailsEric Strole
4th. Floor waters garage vent test dwv to unit 412 Inspection requested via web by wes Ritchie-East tower DWV pass. 4" vent for garage drains pass. 4th flr test on water east tower pass. Test on water heater flue room 412 pass.
Water and/or Sewer6/7/20176/8/20176/8/2017ACANC
DetailsEric Strole
4th. Floor waters garage vent test dwv to unit 412 Inspection requested via web by wes Ritchie
Other6/6/20176/6/20176/6/2017PPART
DetailsEric Strole
Gas piping. Some dwv Inspection requested via web by wes Ritchie-East tower 60 lb gas tests pass. Can only have 24 fixture units on a 2" vent. Need to fix leak on DWV.
Other5/30/20175/30/20175/30/2017PPART
DetailsEric Strole
Water heater vents Inspection requested via web by wes Ritchie-Test on w/h flues in units 412, 404, 406, 408 pass
Other5/24/20175/24/20175/24/2017PPASS
DetailsBen Livingston
Gas on half of east tower. One water heater vent on five four on forth floor Inspection requested via web by wes Ritchie
21 60lb test east tower,
502,403,405,407,409 5lb flue
Plumbing Rough-in5/17/20175/18/20175/18/2017APART
DetailsEric Strole
Inspection requested via web by wes Ritchie-1st & 2nd flr east tower test on dwv pass.
Plumbing Rough-in5/17/20175/17/20175/17/2017PPART
DetailsEric Strole
Water line third floor Inspection requested via web by wes Ritchie-3rd flr test on water east tower pass.
Other5/15/20175/15/20175/15/2017PPART
DetailsEric Strole
Four water heater vents on fifth floor west tower Inspection requested via web by wes Ritchie-Units 504 thru 510 test on water heater flues pass.
Plumbing Rough-in5/11/20175/11/20175/11/2017PPART
DetailsEric Strole
Inspection requested via web by wes Ritchie-Need to fix leaks and reverse grade and missing nailplates and need to be 6" above flood level rim before tieing vents together.
Other5/9/20175/10/20175/10/2017APART
DetailsEric Strole
4 water heater vents Inspection requested via web by wes Ritchie-Test on water heater flues in units 501 thru 509 pass.
Plumbing Rough-in5/2/20175/3/20175/3/2017APART
DetailsEric Strole
East tower garage dwv Seconded floor dwv waters on second floor Inspection requested via web by wes Ritchie-2nd flr east tower test on water in units pass.
Plumbing Rough-in4/24/20174/24/20174/24/2017PPART
DetailsEric Strole
Inspection requested via web by wes Ritchie-Water in units 2nd flr west tower pass.
Plumbing Rough-in4/17/20174/18/20174/18/2017PPART
DetailsEric Strole
DWV 2nd & 3rd flr west tower pass.
Plumbing Rough-in4/17/20174/17/20174/18/2017PPART
DetailsBill VanDegrift
waste test only 3rd floor, leak on santee room 308
Plumbing Rough-in4/17/20174/17/20174/17/2017PPART
DetailsEric Strole
Need to fix 3 leaks on dwv 2nd flr west tower.
Plumbing Rough-in4/13/20174/13/20174/13/2017APART
DetailsEric Strole
Water pipe on third floor Inspection requested via web by wes Ritchie-Test on water 3rd flr west tower pass.
Plumbing Rough-in4/11/20174/11/20174/11/2017PPASS
DetailsEric Strole
Inspection requested via web by wes Ritchie-Primary and secondary roof drains west tower pass.
Plumbing Rough-in4/10/20174/10/20174/10/2017PCANC
DetailsEric Strole
>> Inspection requested via web by wes Ritchie Inspection cancelled from web by: wes Ritchie
Plumbing Rough-in4/7/20174/10/20174/10/2017ACANC
DetailsEric Strole
Other4/7/20174/7/20174/7/2017PPART
DetailsEric Strole
West tower all 60 lb gas test pass.
Plumbing Rough-in4/6/20174/7/20174/7/2017PNR
DetailsEric Strole
Other4/6/20174/7/20174/7/2017APART
DetailsEric Strole
60 lb gas test on 9 units west tower pass
Other4/6/20174/6/20174/6/2017PPART
DetailsEric Strole
Water on 4 th
Gas on 2and 3 Inspection requested via web by wes Ritchie-60 lb gas test on 9 units west tower pass.
Plumbing Rough-in4/6/20174/6/20174/6/2017PPART
DetailsEric Strole
Water on 4 th
Gas on 2and 3 Inspection requested via web by wes Ritchie-Test on water 4th flr west tower pass.
Other3/31/20173/31/20173/31/2017PPART
DetailsEric Strole
Gas line inspection Phone #: ###-#### Inspection requested via web by wes Ritchie-60 lb gas test west tower pass. 10 units.
Roof Drains3/29/20173/30/20173/30/2017PCANC
DetailsEric Strole
Inspection cancelled from web by: wes Ritchie
Plumbing Rough-in3/29/20173/29/20173/29/2017PPART
DetailsEric Strole
Dwv on fifth floor ten units Phone #: ###-#### Inspection requested via web by wes Ritchie-DWV test west tower 4th & 5th flr pass.
Other3/29/20173/29/20173/29/2017PPART
DetailsEric Strole
Gas on fifth floor Phone #: ###-#### Inspection requested via web by wes Ritchie-60 lb gas test 5th flr west tower pass. 10 units.
Plumbing Rough-in3/24/20173/24/20173/24/2017PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by wes Ritchie-Water 5th flr tower 5 pass.
Water and/or Sewer3/24/20173/24/20173/24/2017PCANC
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by wes Ritchie
PLM-Aging Inspection3/22/20173/22/20173/22/2017 PART
DetailsEric Strole
wip