PLM-Aging Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Dan Ediger
|
|
|
Paige Mechanical completed mixing plant corrections.
|
PLM-Aging Inspection | 12/3/2018 | 12/3/2018 | 12/4/2018 | | NH |
Dan Ediger
|
|
|
tagged door
|
PLM-Aging Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 5/15/2018 | 5/15/2018 | 5/17/2018 | | PEND |
Dan Ediger
|
|
|
spoke with Mark Luhaun at the job site. He will gat an update from Andrew Phelps. Gene from Coonse Well Drilling contacted me do get info. I will meet Gene on the site when he can schedule.
|
PLM-Aging Inspection | 2/13/2018 | 2/13/2018 | 2/13/2018 | | PEND |
Dan Ediger
|
|
|
waitng on owner to install rp at well
|
PLM-Aging Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | | PEND |
Dan Ediger
|
|
|
wip
|
PLM-Aging Inspection | 8/15/2017 | 8/15/2017 | 8/15/2017 | | PEND |
Dan Ediger
|
|
|
Met with Andrew Phelps. Went over requirements and he will coordinate.
|
Other | 2/24/2017 | 2/27/2017 | 2/28/2017 | A | PEND |
Dan Ediger
|
|
|
as per Bill V. Wrote a correction notice to install a 4" rp or larger at the pump house manifold and move the potable water feed upstream of the RP
|
Final | 1/10/2017 | 1/11/2017 | | A | |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Boe Jares
|