Final | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Need open front seats in public restrooms along with tempered water to public lavs.Need seperate water supply to soap dispensor at mop sink and have all backflows tested. Temp final ok.
|
Final | 6/24/2018 | 6/25/2018 | 6/25/2018 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-Not ready.
|
Final | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | PART |
Eric Strole
|
|
|
frist floor rooms, General is looking for temp Phone #: ###-#### Inspection requested via web by Raul Castanon-Temp occupancy to move furniture into rooms only.
|
Pressure Test | 6/8/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Bill VanDegrift
|
|
|
correction complete Inspection requested via web by Raul Castanon 60 test ok also talked about temp occ on monday
|
Pressure Test | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | FAIL |
Eric Strole
|
|
|
gas pressure test on a 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon-Need to wrap gas pipe where it penetrates building to outside and retest.
|
Med/Gas Systems | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | CANC |
Eric Strole
|
|
|
gas pressure test on a 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Final | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PART |
Eric Strole
|
|
|
2nd, 3rd and 4th floor rooms, Phone #: ###-#### Inspection requested via web by Raul Castanon-2nd, 3rd & 4th floor rooms pass.
|
Plumbing Rough-in | 5/16/2018 | 5/16/2018 | 5/16/2018 | A | PART |
Bill VanDegrift
|
|
|
laundry room Phone #: ###-#### Inspection requested via web by Raul Castanon r.p.'s for the clothes washers are in the mechanical room. piping just stubbed in to room at this point. left notice c.c.c is required for those washers.
|
Plumbing Rough-in | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Eric Strole
|
|
|
Raul-r. i. in laundry room Phone #: ###-####
|
Pressure Test | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | CANC |
Eric Strole
|
|
|
1st and 2nd floor water test for rooms Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Plumbing Rough-in | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PART |
Eric Strole
|
|
|
###-#### rolo-Test on water in rooms on 1st & 2nd flr pass.
|
Plumbing Rough-in | 1/19/2018 | 1/19/2018 | 1/22/2018 | P | PART |
Eric Strole
|
|
|
east side 3rd and 4th floor water in rooms Phone #: ###-#### Inspection requested via web by Raul Castanon-3rd & 4th flr east side water in units pass.
|
Plumbing Rough-in | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | CANC |
Eric Strole
|
|
|
East side floors 3 & 4 - Raul Phone #: ###-####
|
Plumbing Rough-in | 1/12/2018 | 1/12/2018 | 1/12/2018 | P | PART |
Eric Strole
|
|
|
3rd and 4th floor water west side-per Bill V. ok to have inspection with fees due--3rd & 4th flr west end water in units pass.
|
Plumbing Rough-in | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PART |
Bill VanDegrift
|
|
|
roof drains - Raul Phone #: ###-#### last rd test ok
|
Plumbing Rough-in | 12/21/2017 | 12/22/2017 | 12/22/2017 | P | PART |
Bill VanDegrift
|
|
|
last DWV test ok, needs two sets of rd and of
|
Plumbing Rough-in | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | NR |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | NR |
Bill VanDegrift
|
|
|
should have been a pm inspection
|
Plumbing Rough-in | 12/19/2017 | 12/20/2017 | 12/20/2017 | P | PART |
Eric Strole
|
|
|
Need to fix a few leaks, one backgrade and need to tie toilet vent in above flood level rim.
|
Plumbing Rough-in | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | PART |
Eric Strole
|
|
|
DWV test on building Phone #: ###-#### Inspection requested via web by Raul Castanon-9 tub walls north/west end ok to cover.
|
Plumbing Rough-in | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PART |
Eric Strole
|
|
|
waste inspections on tub walls that need sheet rock for installation of tubs Phone #: ###-#### Inspection requested via web by Raul Castanon-4th flr west end tub walls except shear walls that are covered ok to sheetrock.
|
Other | 11/14/2017 | 11/15/2017 | 11/15/2017 | A | PART |
Bill VanDegrift
|
|
|
Sprinkler double ck, it has been certified Phone #: ###-#### Inspection requested via web by Raul Castanon just the dcva for the irrigation system test ok
|
Groundwork | 7/18/2017 | 7/18/2017 | 7/18/2017 | A | PART |
Bill VanDegrift
|
|
|
public restrooms Phone #: ###-#### Inspection requested via web by Raul Castanon restroom, washers gw ok
|
Groundwork | 7/13/2017 | 7/14/2017 | 7/14/2017 | P | PART |
Eric Strole
|
|
|
east side Phone #: ###-#### Inspection requested via web by Raul Castanon-East half dwv pass.
|
Groundwork | 7/5/2017 | 7/6/2017 | 7/6/2017 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon-West half of ground work pass.
|
Groundwork | 6/28/2017 | 6/28/2017 | 6/28/2017 | P | PART |
Eric Strole
|
|
|
Trunkline pass
|
Groundwork | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PART |
Eric Strole
|
|
|
partial groundwork Phone #: ###-#### Inspection requested via web by Raul Castanon-eed to test with a 10" head. OK to cover as long as test is holding.
|
Water and/or Sewer | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PART |
Eric Strole
|
|
|
60 psi Phone #: ###-#### Inspection requested via web by Raul Castanon-Test on water main pass.
|
Groundwork | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | FAIL |
Eric Strole
|
|
|
Main water line only Phone #: ###-#### Inspection requested via web by Raul Castanon-Test fail
|