Permit NumberPLM17-01820
StatusFinaled
Name PARK CENTER PLUMBING
Site Address 3625 W ELDER ST
Project NameComfort Inn and Suites - ID077
Customer Number 
ePlanReviewNo
Description
New: complete plumbing including Ground work
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/27/20186/27/20186/27/2018PPASS
DetailsBill VanDegrift
final ok
Final6/25/20186/26/20186/26/2018PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-Need open front seats in public restrooms along with tempered water to public lavs.Need seperate water supply to soap dispensor at mop sink and have all backflows tested. Temp final ok.
Final6/24/20186/25/20186/25/2018PCANC
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon
Final6/21/20186/22/20186/22/2018PNR
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-Not ready.
Final6/14/20186/14/20186/14/2018APART
DetailsEric Strole
frist floor rooms, General is looking for temp Phone #: ###-#### Inspection requested via web by Raul Castanon-Temp occupancy to move furniture into rooms only.
Pressure Test6/8/20186/8/20186/8/2018APASS
DetailsBill VanDegrift
correction complete Inspection requested via web by Raul Castanon 60 test ok also talked about temp occ on monday
Pressure Test6/7/20186/7/20186/7/2018PFAIL
DetailsEric Strole
gas pressure test on a 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon-Need to wrap gas pipe where it penetrates building to outside and retest.
Med/Gas Systems6/7/20186/7/20186/7/2018PCANC
DetailsEric Strole
gas pressure test on a 2lb system Phone #: ###-#### Inspection requested via web by Raul Castanon
Final6/4/20186/4/20186/4/2018PPART
DetailsEric Strole
2nd, 3rd and 4th floor rooms, Phone #: ###-#### Inspection requested via web by Raul Castanon-2nd, 3rd & 4th floor rooms pass.
Plumbing Rough-in5/16/20185/16/20185/16/2018APART
DetailsBill VanDegrift
laundry room Phone #: ###-#### Inspection requested via web by Raul Castanon r.p.'s for the clothes washers are in the mechanical room. piping just stubbed in to room at this point. left notice c.c.c is required for those washers.
Plumbing Rough-in5/14/20185/14/20185/14/2018PPASS
DetailsEric Strole
Raul-r. i. in laundry room Phone #: ###-####
Pressure Test2/23/20182/26/20182/26/2018ACANC
DetailsEric Strole
1st and 2nd floor water test for rooms Phone #: ###-#### Inspection requested via web by Raul Castanon
Plumbing Rough-in2/23/20182/23/20182/23/2018PPART
DetailsEric Strole
###-#### rolo-Test on water in rooms on 1st & 2nd flr pass.
Plumbing Rough-in1/19/20181/19/20181/22/2018PPART
DetailsEric Strole
east side 3rd and 4th floor water in rooms Phone #: ###-#### Inspection requested via web by Raul Castanon-3rd & 4th flr east side water in units pass.
Plumbing Rough-in1/19/20181/19/20181/19/2018PCANC
DetailsEric Strole
East side floors 3 & 4 - Raul Phone #: ###-####
Plumbing Rough-in1/12/20181/12/20181/12/2018PPART
DetailsEric Strole
3rd and 4th floor water west side-per Bill V. ok to have inspection with fees due--3rd & 4th flr west end water in units pass.
Plumbing Rough-in12/27/201712/28/201712/28/2017APART
DetailsBill VanDegrift
roof drains - Raul Phone #: ###-#### last rd test ok
Plumbing Rough-in12/21/201712/22/201712/22/2017PPART
DetailsBill VanDegrift
last DWV test ok, needs two sets of rd and of
Plumbing Rough-in12/21/201712/21/201712/21/2017PNR
DetailsBill VanDegrift
Plumbing Rough-in12/20/201712/21/201712/21/2017ANR
DetailsBill VanDegrift
should have been a pm inspection
Plumbing Rough-in12/19/201712/20/201712/20/2017PPART
DetailsEric Strole
Need to fix a few leaks, one backgrade and need to tie toilet vent in above flood level rim.
Plumbing Rough-in12/19/201712/19/201712/19/2017PPART
DetailsEric Strole
DWV test on building Phone #: ###-#### Inspection requested via web by Raul Castanon-9 tub walls north/west end ok to cover.
Plumbing Rough-in12/18/201712/18/201712/18/2017PPART
DetailsEric Strole
waste inspections on tub walls that need sheet rock for installation of tubs Phone #: ###-#### Inspection requested via web by Raul Castanon-4th flr west end tub walls except shear walls that are covered ok to sheetrock.
Other11/14/201711/15/201711/15/2017APART
DetailsBill VanDegrift
Sprinkler double ck, it has been certified Phone #: ###-#### Inspection requested via web by Raul Castanon
just the dcva for the irrigation system test ok
Groundwork7/18/20177/18/20177/18/2017APART
DetailsBill VanDegrift
public restrooms Phone #: ###-#### Inspection requested via web by Raul Castanon restroom, washers gw ok
Groundwork7/13/20177/14/20177/14/2017PPART
DetailsEric Strole
east side Phone #: ###-#### Inspection requested via web by Raul Castanon-East half dwv pass.
Groundwork7/5/20177/6/20177/6/2017PPART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Raul Castanon-West half of ground work pass.
Groundwork6/28/20176/28/20176/28/2017PPART
DetailsEric Strole
Trunkline pass
Groundwork6/27/20176/28/20176/28/2017APART
DetailsEric Strole
partial groundwork Phone #: ###-#### Inspection requested via web by Raul Castanon-eed to test with a 10" head. OK to cover as long as test is holding.
Water and/or Sewer6/19/20176/19/20176/19/2017PPART
DetailsEric Strole
60 psi Phone #: ###-#### Inspection requested via web by Raul Castanon-Test on water main pass.
Groundwork6/16/20176/16/20176/16/2017PFAIL
DetailsEric Strole
Main water line only Phone #: ###-#### Inspection requested via web by Raul Castanon-Test fail