Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Bill VanDegrift
|
|
|
this permit is for both packages the building permit description references this permit for the ti and package A.
|
Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PEND |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Waiting on medgas reports
|
Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PART |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Final rough-in was completed on May 29, 2018. 1. All backflow assemblies in the existing building need cerifications due to out of date. 2. Expose the water service tracer wire at the building. 3. Verify all med gas certs have been forwarded to the City of Boise. Temp occ ok
|
Plumbing Rough-in | 5/29/2018 | 5/30/2018 | 5/30/2018 | P | PART |
Dan Ediger
|
|
|
JOHNNY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Swing room, West break room/rr. ok to cover
|
Plumbing Rough-in | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Operating room sinks (two)
|
Plumbing Rough-in | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Dan Ediger
|
|
|
JOHNNY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Pharmacy sink
|
Groundwork | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Dan Ediger
|
|
|
PLEASE CALL CHAD FOR DIRECTIONS TO WORK. HIS NUMBER IS ###-####. Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Old observation room/new break room sink and restrooms.
|
Groundwork | 4/23/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Dan Ediger
|
|
|
CHAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Groundworks in ANSE
|
Groundwork | 4/20/2018 | 4/23/2018 | 4/23/2018 | P | FAIL |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. couldn't locate work. please leave notes as to what I'm to inspect. Could not make connection with Russell.
|
Groundwork | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Groundwork | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Groundwork for one sink Pharmacy, one sink new OR, one sink break room, and one rr in the men's locker room. Adding a 3" end of line cleanout nexst to the lav.
|
Final | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PART |
Dan Ediger
|
|
|
The extended stay rooms are ok to occupy. Hub drain needs to have a trap primer installed.
|
Final | 3/7/2018 | 3/9/2018 | 3/9/2018 | A | NR |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 3/6/2018 | 3/8/2018 | 3/7/2018 | A | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Plumbing Rough-in | 2/12/2018 | 2/13/2018 | 2/13/2018 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Clinic sink in wall plumbing ok
|
Groundwork | 1/26/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Rough-in for the Nepturne machine drains. ok to cover
|
Groundwork | 1/17/2018 | 1/18/2018 | 1/18/2018 | P | PART |
Bill VanDegrift
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER gw for two surgical garbage disposals ok
|
Plumbing Rough-in | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. NW hall/center 2 extended stay units ok to cover
|
Plumbing Rough-in | 12/26/2017 | 12/27/2017 | 12/27/2017 | A | FAIL |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1. Support all shower heads at drop ears. 2. Support all copper at 6' (verify) 3. Nail plate where missing.
|
Plumbing Rough-in | 12/20/2017 | 12/26/2017 | 12/26/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER NW Extended stay 2rms
|
Med/Gas Systems | 12/19/2017 | 12/20/2017 | 12/20/2017 | P | PART |
Dan Ediger
|
|
|
Med gas pass 24hr test
|
Plumbing Rough-in | 12/19/2017 | 12/20/2017 | 12/20/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Three southwest extended stay and two center corridor ok to cover.
|
Plumbing Rough-in | 12/19/2017 | 12/21/2017 | 12/20/2017 | P | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Med/Gas Systems | 12/19/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Dan Ediger
|
|
|
|
Water and/or Sewer | 12/19/2017 | 12/20/2017 | 12/19/2017 | A | CANC |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 12/14/2017 | 12/19/2017 | 12/19/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Start Med Gas pressure test 2:30pm
|
Plumbing Rough-in | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Extended stay rooms south wall.
|
Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PART |
Bill VanDegrift
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial occupancy for the mob on the south side. still need to set some equipment in the kitchen and dining area.
|
Roof Drains | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | FAIL |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT 20-###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Roof drains: Two leaks and one backgrade
|
Plumbing Rough-in | 11/15/2017 | 11/17/2017 | 11/17/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. East corridor water and cleanroom ok
|
Plumbing Rough-in | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 196/197 ok to cover restrooms. Urinal cleanout to move above the urinal in the access panal
|
Final | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PART |
Dan Ediger
|
|
|
THIS IS FOR THE PHARMACY. RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Pharmacy sink is approved
|
Final | 10/3/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Med gas final in New OR #141
|
Groundwork | 10/4/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
Dan Ediger
|
|
|
Roof drain ground work for the center building west end
|
Plumbing Rough-in | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PART |
Dan Ediger
|
|
|
roof drains ok to cover. Water test complete
|
Water and/or Sewer | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | CANC |
Dan Ediger
|
|
|
not scheduled-mistake.
|
Final | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | NR |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | NR |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PART |
Dan Ediger
|
|
|
Area "A" overhead water ok to cover
|
Plumbing Rough-in | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | NR |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 9/19/2017 | 9/20/2017 | 9/20/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Three west sinks and laundry waters ok to cover. Need test on the lint trap vent and 4" vent riser in the laundry.
|
Groundwork | 9/12/2017 | 9/13/2017 | 9/13/2017 | A | PASS |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 9/5/2017 | 9/6/2017 | 9/5/2017 | A | PART |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Ground work for the roof drains in the central building.
|
Groundwork | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 192-193 and laundry up to the lent trap
|
Groundwork | 8/28/2017 | 8/29/2017 | 8/29/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 166,167, 188, 189 ok to cover. The hand sink will wet vent on the lent trap in teh laundry
|
Groundwork | 8/24/2017 | 8/25/2017 | 8/25/2017 | A | PART |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 162.163,158,159,170,171
|
Groundwork | 8/24/2017 | 8/25/2017 | 8/24/2017 | P | CANC |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Groundwork | 8/22/2017 | 8/23/2017 | 8/23/2017 | A | PART |
Dan Ediger
|
|
|
JOHN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. GW 182-184-185-233-237-238 ok to cover
|
Groundwork | 8/18/2017 | 8/22/2017 | 8/22/2017 | A | PART |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Extend stay room and center janitor
|
Plumbing Rough-in | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PART |
Dan Ediger
|
|
|
Pressure test on the kitchen dwv top out.. Still nees plate strapped. PT ok
|
Plumbing Rough-in | 8/15/2017 | 8/18/2017 | 8/17/2017 | P | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Plumbing Rough-in | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.. Ground work for the sterile room and east end rr next to the sterile room ok to cover. The kitchen walls per code; scheduled to come back this afternoon to recheck pressure test.
|
Plumbing Rough-in | 8/11/2017 | 8/15/2017 | 8/14/2017 | P | CANC |
Dan Ediger
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Groundwork | 8/8/2017 | 8/9/2017 | 8/9/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 6" main drain from east to west-out. Branch lines capped.
|
Plumbing Rough-in | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Passed as part medical gas
|
Med/Gas Systems | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. New surgical room walls ok to cover/under test. Retest after running the line extensions.
|
Groundwork | 8/1/2017 | 8/2/2017 | 8/2/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Pharmacy water and waste in the wall ok to cover. The vent will be run after ductwook install. The sewer from the grease line not approved. The tank needs the vent hooked up on the outlet side of the interceptor and tested. The santees in the tank will need to be capped on the top but not glued.
|
Groundwork | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | CANC |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Rescheduled as a rough in
|
Plumbing Rough-in | 7/31/2017 | 7/31/2017 | 7/31/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. West wing DWV H2O ok to cover
|
Groundwork | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Fire riser room and rr. SE corner ok
|
Other | 7/18/2017 | 7/19/2017 | 7/19/2017 | P | CANC |
Dan Ediger
|
|
|
complete 24 hour test
|
Groundwork | 7/17/2017 | 7/18/2017 | 7/18/2017 | P | PART |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Kitchen plumbing in southeast corner ok to cover. Grease trap vent to be coredrilled and inspected on rough-in
|