PLM-Aging Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Expired | 1/25/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PART |
Eric Strole
|
|
|
wip
|
Final | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Eric Strole
|
|
|
Room 382 in Building 12. Phone #: ###-#### Inspection requested via web by Joseph Corcoran
|
Final | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Eric Strole
|
|
|
Building 12 Room 383. Phone #: ###-#### >> Inspection requested via web by Joseph Corcoran Inspection cancelled from web by: Joseph Corcoran
|
Plumbing Rough-in | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | CANC |
Eric Strole
|
|
|
Room 383 in Building 12 . Building 1 is the office. Phone #: ###-#### Inspection requested via web by Joseph Corcoran
|
PLM-Aging Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PART |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | | PART |
Eric Strole
|
|
|
wip
|
Final | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | FAIL |
Eric Strole
|
|
|
Room 334 now opened up. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-No inspections till permits are issued for water heaters and expantion tanks.
|
Other | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PEND |
Bill VanDegrift
|
|
|
had a call from Bob Barrow the GC concerning maintenance workers installing water heaters and expansion tanks. They are going to have a meeting to discuss how to move foward. I offered to invite the state compliance officer to the next meeting to expain any licensing issues because I do not seem to be being understood.
|
Plumbing Rough-in | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Eric Strole
|
|
|
Room 334 Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Unit 334 pass
|
Plumbing Rough-in | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | CANC |
Eric Strole
|
|
|
Final on room/unit 168 and rough in for shower valves in unit 185 , 373 , 176 , 340 , 375 , and one in Building 5 . Phone #: ###-#### Inspection requested via web by Joseph Corcoran
|
Other | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Bill VanDegrift
|
|
|
Final out this work requested 10 shower valves complete per permit requested. Phone #: ###-#### Inspection requested via web by Joseph Corcoran this inspection was for the tub valves in 6 buildings, they are ok to cover, when contractor provides spreadsheet with building addresses and fixtures this inspection can be transfered to those permits and this permit can be finaled because there is no work being done in this building. the units are... unit 185 in building 12 units 264 and 360 in building 9 unit 345 in building 7 unit 235 in building 6 unit 313 in building 3 units 201 and 203 in building 2
|
Other | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | DONE |
Eric Strole
|
|
|
Bob Barrow from Barrow Construction and Design has a few questions on permit cost for this project and has a few questions regarding changing out the old original valves / fixtures in each unit . We are requesting a preliminary on the old original valves in the units. Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Conferance
|