Final | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM-Aging Inspection | 4/12/2018 | 4/12/2018 | 4/12/2018 | | PASS |
Dan Ediger
|
|
|
wip
|
Plumbing Rough-in | 11/13/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 10/17/2017 | 10/18/2017 | 10/18/2017 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. 1. Plate strap the bases of all stacks unless 5" nail plates will cover. 2. Kitchen sink drain is backgrading. 3. The upstairs t/s spud is leaking on the waste and overflow. 4. The 3" drain to the overhead bath is flat. Correct grade issue.
|
Groundwork | 8/16/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|