Final | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Daryl Spivey
|
|
|
Final 5th floor patio Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Final | 11/28/2018 | 11/28/2018 | 11/28/2018 | A | PART |
Matt Wrobel
|
|
|
Final inspection for Level 1 units and common areas. Phone #: ###-#### Inspection requested via web by Preston Langdon still need to finish gas and 1 fixture on deck
|
Final | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | FAIL |
Dan Ediger
|
|
|
Provide a permanently stamped metal tag on the gas meter showing the address.
|
Final | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | CANC |
Dan Ediger
|
|
|
Final Level One Phone #: ###-#### Inspection requested via web by Preston Langdon Rescheduled for morning
|
Final | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PART |
Dan Ediger
|
|
|
1st and 2nd floors
|
Final | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PART |
Dan Ediger
|
|
|
Finish Trim 3rd floor and 2nd floor. Gas connection to meter. Phone #: ###-#### Inspection requested via web by Preston Langdon Second and Third floor final and gas meter bank connection. ok
|
Final | 10/12/2018 | 10/15/2018 | 10/15/2018 | P | PART |
Daryl Spivey
|
|
|
Water meter Tie-In, area drain sub-rough, level 5 finish, level 4 finish. Phone #: ###-#### Inspection requested via web by Preston Langdon 5th floor and 4th floor completed.........water tie in done and backflows tested.........ds
|
Final | 9/4/2018 | 9/4/2018 | 9/4/2018 | A | PART |
Daryl Spivey
|
|
|
Finish inspection for mock-up unit 519. Phone #: ###-#### Inspection requested via web by Preston Langdon 519 ok with d/w install...........ds
|
Groundwork | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Daryl Spivey
|
|
|
Grease interceptor tie in Phone #: ###-#### Inspection requested via web by Preston Langdon upstream waste and downstream vent tied in ok to G/I.
|
Plumbing Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Daryl Spivey
|
|
|
Rough in 1st level common areas. Phone #: ###-#### Inspection requested via web by Preston Langdon rough in completed............ds
|
Plumbing Rough-in | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Daryl Spivey
|
|
|
Rough in: Units 113 - 115, West overhead Phone #: ###-#### Inspection requested via web by Preston Langd marked on plan..........ds
|
Plumbing Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | PART |
Daryl Spivey
|
|
|
Rough in; east side overhead, units 110-112 Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 7/16/2018 | 7/16/2018 | 7/16/2018 | A | PART |
Daryl Spivey
|
|
|
Rough overhead drainage, south units Phone #: ###-#### Inspection requested via web by Preston Langdon 1st floor south overhead waste tested and gas to meter location tested at 60 lbs.......ds
|
Plumbing Rough-in | 6/27/2018 | 6/28/2018 | 6/28/2018 | P | PART |
Daryl Spivey
|
|
|
Rough water 310-316 Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plan....3rd floor done.....ds
|
Plumbing Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | PART |
Daryl Spivey
|
|
|
Rough water 301-308, 319-317 Phone #: ###-#### Inspection requested via web by Preston Langdon and 309..........ds
|
Plumbing Rough-in | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | PART |
Daryl Spivey
|
|
|
Rough water 413-415 Phone #: ###-#### Inspection requested via web by Preston Langdon ok for cover......ds
|
Plumbing Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PART |
Daryl Spivey
|
|
|
Rough waters, 417,416, 407-412 Phone #: ###-#### Inspection requested via web by Preston Langdon 7 thru 12 and 16,17 are complete on 4th floor.marked on plans..........ds
|
Plumbing Rough-in | 6/19/2018 | 6/20/2018 | 6/20/2018 | P | PART |
Daryl Spivey
|
|
|
Rough Water 401-406, 419, 418 Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plans............ds
|
Plumbing Rough-in | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PART |
Daryl Spivey
|
|
|
Units 512-515, 404, 304 Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plans............ds
|
Plumbing Rough-in | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PART |
Daryl Spivey
|
|
|
Water main and Risers, DWV stacks and water 517, 516, 507-511 Phone #: ###-#### Inspection requested via web by Preston Langdon areas ok for cover are marked on plans.........ds
|
Plumbing Rough-in | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PART |
Daryl Spivey
|
|
|
Partial Gas, DWV stacks 01-05 + 19, Roof drains, Water 501-505 + 519 Phone #: ###-#### Inspection requested via web by Preston Langdon 60 lb test on gas ok..........r/d's tested and 2nd floor rooms ok for cover.......not corridor.......rooms on 5th floor ok for cover marked on plans..........ds
|
Plumbing Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 | A | PART |
Daryl Spivey
|
|
|
Mechanical chase plumbing Phone #: ###-#### Inspection requested via web by Preston Langdon vents and water riser in mech chase tested ok.........ds
|
Plumbing Rough-in | 5/3/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Daryl Spivey
|
|
|
Rough Plumbing: 216, 215, 214, 213, 212 Phone #: ###-#### Inspection requested via web by Preston Langdon 2nd floor rooms roughin complete except 217............still have corridor water to run..........roof drains tested thru 2nd floor.......ds
|
Plumbing Rough-in | 5/3/2018 | 5/3/2018 | 5/3/2018 | A | PASS |
Daryl Spivey
|
|
|
Rough plumbing: 207, 208, 209, partial 217 Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PART |
Daryl Spivey
|
|
|
Rough plumbing: 203, 206, 219, 218 Phone #: ###-#### Inspection requested via web by Preston Langdon and 205 tested......ds
|
Plumbing Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Daryl Spivey
|
|
|
Rough plumbing. 201, 202, 203, 204, 205 Phone #: ###-#### Inspection requested via web by Preston Langdon 201, 202 and 2o5 waste and water tested.........203 and 204 partial..........ds
|
Plumbing Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PART |
Daryl Spivey
|
|
|
Sanitary and water garage overhead. Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PART |
Daryl Spivey
|
|
|
Area B roof drain garage overhead. Area C sanitary garage overhead. Phone #: ###-#### Inspection requested via web by Preston Langdon roof drains tested and partial waste in area C.............ds
|
Roof Drains | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PART |
Daryl Spivey
|
|
|
Area A roof drain mains Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 1/18/2018 | 1/18/2018 | 1/18/2018 | A | PART |
Daryl Spivey
|
|
|
Garage Area A Sanitary overhead. Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Water and/or Sewer | 1/18/2018 | 1/18/2018 | 1/18/2018 | A | CANC |
Daryl Spivey
|
|
|
Garage Area A Sanitary overhead. Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PART |
Daryl Spivey
|
|
|
First floor Sub-rough, area B Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Other | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Daryl Spivey
|
|
|
Snowmelt radiant tubing on garage ramp Phone #: ###-#### Inspection requested via web by Preston Langdon 100 lb test ok........ds
|
Plumbing Rough-in | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PART |
Daryl Spivey
|
|
|
Area A sub-rough. Phone #: ###-#### Inspection requested via web by Preston Langdon 1st fl under floor south west tested ok......ds
|