Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberPLM18-00716
StatusFinaled
Name DEBEST PLUMBING INC
Site Address 305 E JEFFERSON ST
Project NameSt. Luke's Children's Pavilion
Customer Number17-81
ePlanReviewNo
Description
New: Sanitary drain-waste-vent, domestic water, rain drains, and fixtures.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/11/20194/12/20194/12/2019PPASS
DetailsDaryl Spivey
Temp Final C/O 4th ; 5th floors. if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
no occ card to sign...................ds
Final4/10/20194/11/20194/11/2019PPART
DetailsDaryl Spivey
temp final CO - 3rd ; 4th Floors. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
3rd floor ok.......4th floor NR..........ds
Final4/1/20194/2/20194/2/2019APART
DetailsDaryl Spivey
PARTIAL Final - Final for floors 1 ; 2 ready now. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
floors 1 and 2 and lower 2 and 3 ok..........ds
Plumbing Rough-in2/28/20193/4/20193/4/2019APART
DetailsDan Ediger
penthouse vents and domestic water. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. provide 1" air gap on t&ps
Plumbing Rough-in2/14/20192/15/20192/15/2019PPART
DetailsMatt Wrobel
before 2:30pm, R.I. for 3rd ; 4th east sinks ; 5th west Mop sink ; restroom.
If questions call Donny @ ###-####. Inspection requested via web by Stacia Haumann
Plumbing Rough-in1/23/20191/24/20191/24/2019PPART
DetailsDaryl Spivey
east drinking fountains R.I. 2nd threw 4th floors ; waste ; vents 5th floor west restroom ; mop sink room.
If questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in1/23/20191/23/20191/23/2019PNR
DetailsDaryl Spivey
east drinking fountains R.I. 2nd threw 4th floors ; waste ; vents 5th floor west restroom ; mop sink room.
If questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in1/11/20191/11/20191/11/2019PPART
DetailsDaryl Spivey
Before 2pm please, as our company is having a meeting @ 3pm offsite. If questions call Donny @ ###-####
4th Floor Area C - Wall water and Mains Pressure Test. Phone #: ###-#### Inspection requested via web by Stacia Haumann
4th floor rough in ok..........ds
Plumbing Rough-in12/20/201812/20/201812/20/2018PPASS
DetailsMatt Wrobel
4th floor waste ; vent C area ; 4th floor B wall water ; mains 100# test.
If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in12/5/201812/6/201812/6/2018APART
DetailsDan Ediger
4th floor area A - water ; waste. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
area A water in walls and main.
area A/B dwv
Plumbing Rough-in11/13/201811/14/201811/14/2018PPART
DetailsDan Ediger
3rd floor Area C, Water wall rough-in pressure test. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
3rd floor east half in-wall water
Plumbing Rough-in10/31/201811/1/201811/1/2018APART
DetailsDaryl Spivey
Rough-In waste/vent - 3rd floor area C. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
marked on plan............ds
Plumbing Rough-in10/25/201810/25/201810/25/2018PPART
DetailsDaryl Spivey
3rd floor (c) waste ; vent, 4th floor rain drains and east shaft. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
marked on plans.....ds
Plumbing Rough-in10/23/201810/23/201810/23/2018PPART
DetailsDaryl Spivey
4th floor (A) waste ; vent R.I. ; 4th floor rain drain R.I.
3rd floor (C) waste ; vent R.I.

If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
partial thru 4th floor and partial 3rd floor area A.......as marked on plan.......ds
Plumbing Rough-in10/16/201810/16/201810/16/2018PPART
DetailsDaryl Spivey
waste/vent 3rd floor area B. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
3rd floor as marked on plans............ds
Plumbing Rough-in10/11/201810/11/201810/11/2018PPART
DetailsDaryl Spivey
Waste/Water/Vent for 3rd Floor B. Pressure test. If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
3rd floor
tested water and waste..........ds
Plumbing Rough-in10/9/201810/9/201810/9/2018PPART
DetailsDaryl Spivey
Water ; waste ; mains, 3rd Floor A area. If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
3 rd floor area A waste and water tested ok.......ds
Roof Drains8/28/20188/28/20188/28/2018PPART
DetailsBill VanDegrift
1st floor east Rain Drain Inspection. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in8/21/20188/22/20188/22/2018PPART
DetailsDaryl Spivey
waste ; vent 2nd floor. If possible 2pm inspection. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
marked on plans.........ds
Water and/or Sewer8/16/20188/16/20188/17/2018PCANC
DetailsDaryl Spivey
Waste 2nd floor inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
Plumbing Rough-in8/16/20188/16/20188/16/2018PPART
DetailsDaryl Spivey
Waste 2nd floor inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
waste and vent marked on plans...........ds
Roof Drains8/15/20188/15/20188/15/2018PPART
DetailsDaryl Spivey
if questions call Steve ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
roof drains as marked on 2nd floor plan........ds
Plumbing Rough-in8/14/20188/14/20188/14/2018PPART
DetailsDaryl Spivey
Waste inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
marked on 2nd floor plans......water and waste
Plumbing Rough-in8/6/20188/6/20188/6/2018PPART
DetailsDaryl Spivey
Donny 1st floor waste
west end waste and water tested ok.......ds
Plumbing Rough-in8/3/20188/6/20188/6/2018APART
DetailsDaryl Spivey
1st floor wall rough-in, water pressure test ; waste inspection. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
water only tested on 1st floor.....test ok......ds
Pressure Test7/12/20187/12/20187/12/2018PPART
DetailsDaryl Spivey
2nd floor Hydro Pressure Test. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
inspection for hydronics. hydronics were pulled under mech permit and not plumbing. looked at 2nd floor and test and marked off on plans. is called back in for inspection for mech.for 7/13/18 ...........ds
Water and/or Sewer3/1/20183/2/20183/2/2018APART
DetailsDaryl Spivey
Sewer Inspection If any questions please contact Donny G ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
sewer west side stub out ok for cover.........ds
Water and/or Sewer2/28/20183/1/20183/1/2018APART
DetailsBill VanDegrift
Water line inspection; if questions please call Donny ####-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann water service and test ok to cover
Water and/or Sewer2/22/20182/23/20182/23/2018APASS
DetailsDaryl Spivey
Sewer Inspection - If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann