Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Daryl Spivey
|
|
|
Temp Final C/O 4th ; 5th floors. if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann no occ card to sign...................ds
|
Final | 4/10/2019 | 4/11/2019 | 4/11/2019 | P | PART |
Daryl Spivey
|
|
|
temp final CO - 3rd ; 4th Floors. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 3rd floor ok.......4th floor NR..........ds
|
Final | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PART |
Daryl Spivey
|
|
|
PARTIAL Final - Final for floors 1 ; 2 ready now. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann floors 1 and 2 and lower 2 and 3 ok..........ds
|
Plumbing Rough-in | 2/28/2019 | 3/4/2019 | 3/4/2019 | A | PART |
Dan Ediger
|
|
|
penthouse vents and domestic water. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. provide 1" air gap on t&ps
|
Plumbing Rough-in | 2/14/2019 | 2/15/2019 | 2/15/2019 | P | PART |
Matt Wrobel
|
|
|
before 2:30pm, R.I. for 3rd ; 4th east sinks ; 5th west Mop sink ; restroom. If questions call Donny @ ###-####. Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 1/23/2019 | 1/24/2019 | 1/24/2019 | P | PART |
Daryl Spivey
|
|
|
east drinking fountains R.I. 2nd threw 4th floors ; waste ; vents 5th floor west restroom ; mop sink room. If questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | NR |
Daryl Spivey
|
|
|
east drinking fountains R.I. 2nd threw 4th floors ; waste ; vents 5th floor west restroom ; mop sink room. If questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PART |
Daryl Spivey
|
|
|
Before 2pm please, as our company is having a meeting @ 3pm offsite. If questions call Donny @ ###-#### 4th Floor Area C - Wall water and Mains Pressure Test. Phone #: ###-#### Inspection requested via web by Stacia Haumann 4th floor rough in ok..........ds
|
Plumbing Rough-in | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Matt Wrobel
|
|
|
4th floor waste ; vent C area ; 4th floor B wall water ; mains 100# test. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PART |
Dan Ediger
|
|
|
4th floor area A - water ; waste. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann area A water in walls and main. area A/B dwv
|
Plumbing Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | P | PART |
Dan Ediger
|
|
|
3rd floor Area C, Water wall rough-in pressure test. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 3rd floor east half in-wall water
|
Plumbing Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Daryl Spivey
|
|
|
Rough-In waste/vent - 3rd floor area C. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann marked on plan............ds
|
Plumbing Rough-in | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PART |
Daryl Spivey
|
|
|
3rd floor (c) waste ; vent, 4th floor rain drains and east shaft. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann marked on plans.....ds
|
Plumbing Rough-in | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PART |
Daryl Spivey
|
|
|
4th floor (A) waste ; vent R.I. ; 4th floor rain drain R.I. 3rd floor (C) waste ; vent R.I.
If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann partial thru 4th floor and partial 3rd floor area A.......as marked on plan.......ds
|
Plumbing Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PART |
Daryl Spivey
|
|
|
waste/vent 3rd floor area B. if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 3rd floor as marked on plans............ds
|
Plumbing Rough-in | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PART |
Daryl Spivey
|
|
|
Waste/Water/Vent for 3rd Floor B. Pressure test. If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 3rd floor tested water and waste..........ds
|
Plumbing Rough-in | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | PART |
Daryl Spivey
|
|
|
Water ; waste ; mains, 3rd Floor A area. If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann 3 rd floor area A waste and water tested ok.......ds
|
Roof Drains | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PART |
Bill VanDegrift
|
|
|
1st floor east Rain Drain Inspection. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 8/21/2018 | 8/22/2018 | 8/22/2018 | P | PART |
Daryl Spivey
|
|
|
waste ; vent 2nd floor. If possible 2pm inspection. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann marked on plans.........ds
|
Water and/or Sewer | 8/16/2018 | 8/16/2018 | 8/17/2018 | P | CANC |
Daryl Spivey
|
|
|
Waste 2nd floor inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PART |
Daryl Spivey
|
|
|
Waste 2nd floor inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann waste and vent marked on plans...........ds
|
Roof Drains | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PART |
Daryl Spivey
|
|
|
if questions call Steve ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann roof drains as marked on 2nd floor plan........ds
|
Plumbing Rough-in | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PART |
Daryl Spivey
|
|
|
Waste inspection. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann marked on 2nd floor plans......water and waste
|
Plumbing Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | PART |
Daryl Spivey
|
|
|
Donny 1st floor waste west end waste and water tested ok.......ds
|
Plumbing Rough-in | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PART |
Daryl Spivey
|
|
|
1st floor wall rough-in, water pressure test ; waste inspection. If questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann water only tested on 1st floor.....test ok......ds
|
Pressure Test | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | PART |
Daryl Spivey
|
|
|
2nd floor Hydro Pressure Test. if questions call Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann inspection for hydronics. hydronics were pulled under mech permit and not plumbing. looked at 2nd floor and test and marked off on plans. is called back in for inspection for mech.for 7/13/18 ...........ds
|
Water and/or Sewer | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PART |
Daryl Spivey
|
|
|
Sewer Inspection If any questions please contact Donny G ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann sewer west side stub out ok for cover.........ds
|
Water and/or Sewer | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PART |
Bill VanDegrift
|
|
|
Water line inspection; if questions please call Donny ####-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann water service and test ok to cover
|
Water and/or Sewer | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Daryl Spivey
|
|
|
Sewer Inspection - If there are any questions please contact Donny G. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|