Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Daryl Spivey
|
|
|
Mechanical Final as late as possible please Phone #: ###-#### Inspection requested via web by Jason Brashears
|
Pressure Test | 5/8/2018 | 5/9/2018 | 5/9/2018 | P | PART |
Daryl Spivey
|
|
|
Gas pressure test Phone #: ###-#### Inspection requested via web by Jason Brashears 60 lb test ok..........ds
|
Other | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Daryl Spivey
|
|
|
Consultation Request for backflow prevention clarification. Phone #: ###-#### Inspection requested via web by Jason Brashears
|
Pressure Test | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PART |
Daryl Spivey
|
|
|
Gas piping pressure test - partial Phone #: ###-#### Inspection requested via web by Jason Brashears 60 lb. test ok from meter location to inside stub out in wall.........ds
|
Pressure Test | 4/23/2018 | 4/24/2018 | 4/23/2018 | P | CANC |
Daryl Spivey
|
|
|
Gas piping pressure test - partial system Phone #: ###-#### >> Inspection requested via web by Jason Brashears Inspection cancelled from web by: Jason Brashears
|