Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 9/17/2018 | 9/18/2018 | 9/18/2018 | P | PEND |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Sprinkler (Final) | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PART |
Daryl Spivey
|
|
|
Kevin Phone #: ###-#### ok to cover..........not tested and certified..........ds
|
Plumbing Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Groundwork | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith
|
Plumbing Rough-in | 5/8/2018 | 5/9/2018 | 5/8/2018 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kevin Smith Inspection cancelled from web by: Kevin Smith
|
Groundwork | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Need to vent Tub/Shower.
|