PLM-Aging Inspection | 2/25/2019 | 2/25/2019 | 2/26/2019 | | PASS |
Matt Wrobel
|
|
|
|
DOC - Permit Finaled | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Plumbing Rough-in | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Loar
|
Groundwork | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PASS |
Dan Ediger
|
|
|
|
Water and/or Sewer | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Dan Ediger
|
|
|
Please call office when inspection has been scheduled and inspector is in route Phone #: ###-#### Inspection requested via web by Shane Loar. Piping test ok to cover.
|
Groundwork | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PART |
Dan Ediger
|
|
|
Work to include: install new rough in of bathroom, drinking fountain, break room double bowl sink, resetting of fixtures including new ADA toilet with a new outside sewage ejection system. Phone #: ###-#### Inspection requested via web by Shane Loar. Roll 4x2 wye so the 2" invert is above the centerline.
|