Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Matt Wrobel
|
|
|
Please call Dusty Painter, Granite Superintendent, for scheduling the exact time for the final inspection. Phone #: ###-#### Inspection requested via web by Taylor Landa
|
Roof Drains | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PART |
Matt Wrobel
|
|
|
roof drain // JOSH Phone #: ###-#### consult
|
Other | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PART |
Matt Wrobel
|
|
|
Josh- conference, please call for access Phone #: ###-####
|
Roof Drains | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | FAIL |
Dan Ediger
|
|
|
1. Roof drain conductors must have a minimum a minimum of 12" of cover. 2. Install base of stack clean-outs within 2 feet of the building. 3. All roof drain conductors m
|
PLM-Aging Inspection | 3/11/2019 | 3/11/2019 | 3/12/2019 | | PASS |
Dan Ediger
|
|
|
work complete
|
DOC - Permit Finaled | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Matt Wrobel
|
|
|
work complete
|
Groundwork | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | PASS |
Dan Ediger
|
|
|
Josh Phone #: ###-####. The tracer wire was located and brought above grade at the shut-off valve
|
Groundwork | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PART |
Dan Ediger
|
|
|
Josh Phone #: ###-####. Pressure test ok. Run a tracer wire from the main to the end riser and bring above grade.
|
Water and/or Sewer | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Dan Ediger
|
|
|
OK to cover. Need a guaged pressure test
|
Water and/or Sewer | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | NR |
Dan Ediger
|
|
|
water line // Josh Phone #: ###-####
|
Water and/or Sewer | 5/23/2018 | 5/24/2018 | 5/24/2018 | P | NR |
Dan Ediger
|
|
|
Josh Phone #: ###-####.
|
Water and/or Sewer | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Dan Ediger
|
|
|
Clint Phone #: ###-####. Pass water test to the building on sewer.
|
Water and/or Sewer | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | NR |
Dan Ediger
|
|
|
Josh Phone #: ###-####
|
Water and/or Sewer | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PART |
Dan Ediger
|
|
|
System needs to be put under test. OK to cover the lateral due to depth.
|
Water and/or Sewer | 5/10/2018 | 5/15/2018 | 5/15/2018 | A | PEND |
Dan Ediger
|
|
|
Sewer Service Inspection Phone #: ###-#### Inspection requested via web by Taylor Landa. Consultation
|