Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Daryl Spivey
|
|
|
Final. Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Final | 8/26/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Daryl Spivey
|
|
|
Partial Final on all area B and A (west) units, janitor rooms, laundry rooms, public bathrooms. Phone #: ###-#### Inspection requested via web by Preston Langdon TCO ok..........still have 2 restrooms, 1 mop sink and install 5 missing faucets ..........ds
|
Final | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PART |
Daryl Spivey
|
|
|
|
Final | 8/22/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Daryl Spivey
|
|
|
Partial final for Tower C Trim. Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Final | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Daryl Spivey
|
|
|
Partial final for D Tower fixtures. Walk-through with GC. Phone #: ###-#### Inspection requested via web by Preston Langdon D wing rooms ok.............ds
|
Plumbing Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Daryl Spivey
|
|
|
Rough mechanical room, snow melt manifold and loops. Phone #: ###-#### Inspection requested via web by Preston Langdon rough in complete.........ds
|
Plumbing Rough-in | 7/19/2019 | 7/23/2019 | 7/23/2019 | A | PART |
Daryl Spivey
|
|
|
Water Main area A Phone #: ###-#### Inspection requested via web by Preston Langdon corridor area A tested ok..........tagged gas mains and walked thru mech room..........ds
|
Plumbing Rough-in | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PART |
Daryl Spivey
|
|
|
Gas main rough and pressure test. Water mains rough. Phone #: ###-#### Inspection requested via web by Preston Langdon gas all tested 60 lb. test to meter. Water mains tested from mech room thru east wing......gas and water marked on plans.............ds
|
Plumbing Rough-in | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PART |
Daryl Spivey
|
|
|
Rough water; 401-412, 301-312, 201-212, 101-108. Phone #: ###-#### Inspection requested via web by Preston Langdon south wing rooms roughed in water waste and vent........ds
|
Plumbing Rough-in | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PART |
Daryl Spivey
|
|
|
Rough DWV units 301 - 312, 401 - 412 Phone #: ###-#### Inspection requested via web by Preston Langdon south wing 3rd and 4th floors waste and vent tested ok...........ds
|
Plumbing Rough-in | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Daryl Spivey
|
|
|
Rough DWV: units 101-108, 201-212, roof drains area A Rough Water: hot water return main and riser, snow melt riser Phone #: ###-#### Inspection requested via web by Preston Langdon waste and vent 2 floors..............ds
|
Plumbing Rough-in | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PART |
Daryl Spivey
|
|
|
Rough water Units 217, 117 Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plans............ds
|
Plumbing Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PART |
Daryl Spivey
|
|
|
Rough water: Units 117-120, 213-220, 313-320, 413-420. Rough gas: laundry rooms level 1-4, MAU1 riser, MAU2 riser, FAU1 riser, FAU2 riser. Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plan............ds
|
Plumbing Rough-in | 2/27/2019 | 2/28/2019 | 2/28/2019 | P | PART |
Dan Ediger
|
|
|
Roof drains area A and B Phone #: ###-#### Inspection requested via web by Preston Langdon Area B only ok roof drains
|
Plumbing Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 | P | PART |
Eric Strole
|
|
|
Rough Water: janitor D, laundry, public bathroom, unit#s 21-27 all floors Rough DWV: unit#s 13-20 all floors, roof drains area B Phone #: ###-#### Inspection requested via web by Preston Langdon-Section complete is marked on approved plans.
|
Plumbing Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | PART |
Daryl Spivey
|
|
|
Rough water: 28, 29, 30, 31 towers Phone #: ###-#### Inspection requested via web by Preston Langdon 2nd thru 4th floors water in 12 rooms........marked on plans..........ds
|
Plumbing Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PART |
Daryl Spivey
|
|
|
Rough Waters: #132-141, #232-241, #332-341, #432-441 Phone #: ###-#### Inspection requested via web by Preston Langdon marked on plans..........ds
|
Plumbing Rough-in | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | NR |
Daryl Spivey
|
|
|
Rough Water supply: 30 - 41 stacks (area D) Phone #: ###-#### Inspection requested via web by Preston Langdon
|
Plumbing Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | P | PART |
Daryl Spivey
|
|
|
DWV: 127-427, 128-428, 129-429, Roof drains Phone #: ###-#### Inspection requested via web by Preston Langdon R/Ds, laundry rooms and public restrooms and 27-29 rooms tested 1st thru 4th floors........ds
|
Plumbing Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PART |
Daryl Spivey
|
|
|
Rough DWV: 121-129, 221-229, 321-329, 421-429, Roof drains Phone #: ###-#### Inspection requested via web by Preston Langdon DWV 1st thru 4th floor tested C area rooms 21, 22, 23 and 25............no roof drains tested,,,,,ds
|
Plumbing Rough-in | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PART |
Dan Ediger
|
|
|
DWV rough: 319, 419, 333, 433, 332, 432, 331, 431, 330, 430 Phone #: ###-#### Inspection requested via web by Preston Langdon. dwv 319,419333,332,432,331,431,330,430 ok 433 needs a santee to replace wye on lav
|
Plumbing Rough-in | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | NR |
Dan Ediger
|
|
|
DWV Rough 330, 331, 332, 333, 430, 431, 432, 433, Area D roof drains Phone #: ###-#### Inspection requested via web by Preston Langdon. roof drains area "D" ok
|
Plumbing Rough-in | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PART |
Dan Ediger
|
|
|
DWV 337, 336, 335, 334, 333, 332, 437, 436, 435, 434, 433, 432 Phone #: ###-#### Inspection requested via web by Preston Langdon 336, 337, 436, 437 kitchen 334,335, 434,437 complete r-in 332,333,432,433 condensate 2'
|
Plumbing Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | NR |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Amos Hoyt bld A water test not ready...........ds
|
Pressure Test | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PART |
Daryl Spivey
|
|
|
Water pressure test and pre-rock inspection BLD D and A Phone #: ###-#### Inspection requested via web by Amos Hoyt bld D......10 units south end 1st and 2nd floors water tested ok..........ds
|
Plumbing Rough-in | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | NR |
Daryl Spivey
|
|
|
Partial DWV BLD A first and second floor Phone #: ###-#### Inspection requested via web by Amos Hoyt rescheduled........ds
|
Plumbing Rough-in | 10/2/2018 | 10/3/2018 | 10/3/2018 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Amos Hoyt partial waste test N. east bld 6 units..........not nail plated yet...........ds
|
Groundwork | 7/3/2018 | 7/5/2018 | 7/5/2018 | P | PART |
Daryl Spivey
|
|
|
Inspection requested via web by wes Ritchie marked on plan.........ds
|
Groundwork | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PART |
Daryl Spivey
|
|
|
Inspection requested via web by wes Ritchie Grease line tested ok.marked on plan....ds
|
Groundwork | 7/2/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie section e west of elevators not to kitchen test ok
|
Groundwork | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | FAIL |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie not on test...........ds
|
Groundwork | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | NR |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie
|
Groundwork | 6/28/2018 | 6/28/2018 | 6/28/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie visual on water service........ductile will test later.........ds
|
Groundwork | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie marked on plan..........ok for cover......ds
|
Groundwork | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie partial g/w C area marked on plan.........ds
|
Groundwork | 6/8/2018 | 6/8/2018 | 6/8/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie south area tested..ds
|
Groundwork | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie marked on lans......ds
|
Groundwork | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by wes Ritchie as marked on plan.....ds
|