Final | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 3/21/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER kitchen area east end ok to occupy.........west side not finished yet...........ds
|
Plumbing Rough-in | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 1/30/2019 | 1/31/2019 | 1/31/2019 | P | PART |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water tested in mens and womens bathrooms and W/V tested for restrooms and main bathrooms.........ds
|
Plumbing Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER main water from kit, wall to locker rooms, gym d/f waste and water ..marked on plans........ds
|
Roof Drains | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Matt Wrobel
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | PART |
Eric Strole
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Locker room r/i pass.
|
Water and/or Sewer | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Eric Strole
|
|
|
Interceptor test-PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Test on interceptor pass.
|
Groundwork | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | PART |
Eric Strole
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Start of 24 hr test on interceptor. Test on grease waste pass.
|
Groundwork | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PART |
Bill VanDegrift
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER alt gw ok
|
Groundwork | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PART |
Daryl Spivey
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER marked on plans.........ds
|
Groundwork | 7/16/2018 | 7/17/2018 | 7/17/2018 | P | PART |
Daryl Spivey
|
|
|
RILEY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER marked on plans.......ds
|