Final | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-T&P requires an air-gap above floor drain. Turn in all trap primers.
|
Final | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Need to fix all leaks under sinks. Cannot run T&P into pan drain. Need to run pan drain over to flr drain. Need to hook up all dishwashers. Need trap primers for all flr drains at water heaters. Need to run all 1st flr condensates for furnace to flr drain.
|
PLM-Aging Inspection | 4/5/2019 | 4/5/2019 | 4/5/2019 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Water test fail & missing nailplates.
|
Plumbing Rough-in | 11/9/2018 | 11/9/2018 | 11/9/2018 | P | PART |
Eric Strole
|
|
|
First half of building rough in Phone #: ###-#### Inspection requested via web by Brian Johansen-Cannot have concealed floordains.
|
Groundwork | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Water and/or Sewer | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Water main stub into and out of building pass.
|
Groundwork | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Section complete is marked on plans.
|