Final | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM-Aging Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PASS |
Eric Strole
|
|
|
the other half of the rough Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Eric Strole
|
|
|
per conversation with Kinley this will be a partial rough with out tub/shower Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Water and/or Sewer | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Water supply stub into and out of building pass.
|
Groundwork | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Trunkline pass.
|