Final | 2/22/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | PART |
Daryl Spivey
|
|
|
partial final for Kitchen side only. Please call Brandon before arriving for access. Thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige kitchen ok for final...........ds
|
Plumbing Rough-in | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Eric Strole
|
|
|
please call Brandon prior to arriving for access Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Roof Drains | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Final | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | CANC |
Daryl Spivey
|
|
|
partial final for kitchen area Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Plumbing Rough-in | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Less grease int. vent
|
Groundwork | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Groundwork | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige water service under footing tested...........ds
|
Groundwork | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | CANC |
Daryl Spivey
|
|
|
24 hr test complete......ok for backfill.........ds
|
Groundwork | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PART |
Daryl Spivey
|
|
|
interceptor inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige start 24 hr test on g/i..........ds
|
Groundwork | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | FAIL |
Eric Strole
|
|
|
great tank inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige-Test on interceptor fail.
|
Groundwork | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PART |
Daryl Spivey
|
|
|
G/I tank start 24 hr test.........
|
Other | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige meeting on water sizing and building sewer line outside for grade......water sizing probably should be increased from 1 in. to at least 1 1/4 with hot side added and 100 gal w/h..............ds
|
Groundwork | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|