Final | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Bill VanDegrift
|
|
|
Please call Brad at ###-#### prior to inspection for access to building. Phone #: ###-#### Inspection requested via web by TIM OVERALL
|
Groundwork | 7/23/2018 | 7/24/2018 | 7/23/2018 | A | PASS |
Bill VanDegrift
|
|
|
Please call Brad at ###-#### prior to inspection for access to building. He will meet inspector at the site. Phone #: ###-#### Inspection requested via web by TIM OVERALL gw and interceptor and trench drain ok to cover
|
Groundwork | 7/10/2018 | 7/11/2018 | 7/11/2018 | P | CANC |
Daryl Spivey
|
|
|
Please call Brad prior to arrival on job site for access ###-####. Groundwork only. Phone #: ###-#### Inspection requested via web by TIM OVERALL-please verify if building permit is required
|
Water and/or Sewer | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PART |
Daryl Spivey
|
|
|
Please call Brad prior to arrival on job site for access ###-####. Groundwork only. Phone #: ###-#### Inspection requested via web by TIM OVERALL-please verify if building permit is required looked at sewer tie in at alley........ok for cover.........ds
|