Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PASS |
Daryl Spivey
|
|
|
Josh Wilson site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Other | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Ben Livingston
|
|
|
Partial gas rough-in for fireplace insert. Josh Wilson site contact. Phone #: ###-#### Inspection requested via web by RM Mechanical 20 lb gas and piping to fireplace
|
Other | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Daryl Spivey
|
|
|
Second half ground rough in Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Pressure Test | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Daryl Spivey
|
|
|
Gas pressure test, under ground. Phone #: ###-#### Inspection requested via web by RM Mechanical 2 lines......20 lb test ok....ds
|
Groundwork | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PART |
Daryl Spivey
|
|
|
Partial g/w ..........g/w inside bld to outside.........ds
|
Other | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Daryl Spivey
|
|
|
Brian Anderson site contact. Underground rough in, shower valve install. Phone #: ###-#### Inspection requested via web by RM Mechanical
|
Plumbing Rough-in | 8/2/2018 | 8/3/2018 | 8/3/2018 | P | CANC |
Daryl Spivey
|
|
|
Brian Anderson site contact ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical
|