Final | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Matt Wrobel
|
|
|
Please call Alan with any questions. Thank you Phone #: ###-#### Inspection requested via web by Alan Perkins correction items fixed
|
Final | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Alan Perkins 1. Support the 2" vent at the top of the stairs. 2. Install a double check valve assembly on the beer glass sprayer. 3. Install RP backflow assemblies on the steam oven and expresso machine.
|
Plumbing Rough-in | 8/16/2018 | 8/17/2018 | 8/16/2018 | A | PASS |
Daryl Spivey
|
|
|
Allen Phone #: ###-####
|
Groundwork | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Daryl Spivey
|
|
|
Please Call Alan with questions Phone #: ###-#### Inspection requested via web by Alan Perkins
|