Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberPLM18-03129
StatusFinaled
Name IRON HORSE EXCAVATION LLC
Site Address 2121 N COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Install new sewer service and connect to existing service
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PLM-Aging Inspection5/7/20195/7/20195/7/2019 PASS
DetailsMatt Wrobel
DOC - Permit Finaled5/7/20195/7/20195/7/2019PPASS
DetailsMatt Wrobel
Storm Drains9/4/20189/5/20189/5/2018APART
DetailsBill VanDegrift
Storm drain inspection - Jeremy Short is onsite contact Phone #: ###-#### Inspection requested via web by Mike Basabe south side storm drain building to catch basin ok
Water and/or Sewer8/27/20188/28/20188/28/2018APART
DetailsBill VanDegrift
Request domestic water service inspection.
Jeremy is onsite foreman ###-####
Thanks Phone #: ###-#### Inspection requested via web by Mike Basabe water service test ok
Water and/or Sewer8/21/20188/23/20188/23/2018APART
DetailsBill VanDegrift
Sewer line to grease interceptor inspection. Jeremy Short is onsite contact @###-#### Phone #: ###-#### Inspection requested via web by Mike Basabe building to interceptor ok to cover
Other7/30/20187/30/20187/30/2018PPASS
DetailsDan Ediger
passed 24 hr test
Other7/27/20187/30/20187/30/2018ACANC
DetailsDan Ediger
complete 24 hr test. this afternoon
Water and/or Sewer7/27/20187/27/20187/27/2018PPART
DetailsDan Ediger
start interceptor test
Started 24 hr test 2pm
Water and/or Sewer7/26/20187/27/20187/27/2018APART
DetailsBill VanDegrift
Inspect 2nd sewer service connection
Darrel Carter is onsite ###-####
Phone #: ###-#### Inspection requested via web by Mike Basabe 4" service from new stub to existing.
Water and/or Sewer7/24/20187/25/20187/25/2018PPART
DetailsDan Ediger
Sewer only. 2 sewer services, one new and one existing. Darrel Carter is onsite contact Phone #: ###-#### Inspection requested via web by Mike Basabe.
Sewer off of the gym is appoved.
The grease intercepter is set needs 24hr test and vented. Vent by plumber per excavator.