PLM-Aging Inspection | 5/7/2019 | 5/7/2019 | 5/7/2019 | | PASS |
Matt Wrobel
|
|
|
|
DOC - Permit Finaled | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Storm Drains | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PART |
Bill VanDegrift
|
|
|
Storm drain inspection - Jeremy Short is onsite contact Phone #: ###-#### Inspection requested via web by Mike Basabe south side storm drain building to catch basin ok
|
Water and/or Sewer | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Bill VanDegrift
|
|
|
Request domestic water service inspection. Jeremy is onsite foreman ###-#### Thanks Phone #: ###-#### Inspection requested via web by Mike Basabe water service test ok
|
Water and/or Sewer | 8/21/2018 | 8/23/2018 | 8/23/2018 | A | PART |
Bill VanDegrift
|
|
|
Sewer line to grease interceptor inspection. Jeremy Short is onsite contact @###-#### Phone #: ###-#### Inspection requested via web by Mike Basabe building to interceptor ok to cover
|
Other | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Dan Ediger
|
|
|
passed 24 hr test
|
Other | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | CANC |
Dan Ediger
|
|
|
complete 24 hr test. this afternoon
|
Water and/or Sewer | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PART |
Dan Ediger
|
|
|
start interceptor test Started 24 hr test 2pm
|
Water and/or Sewer | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PART |
Bill VanDegrift
|
|
|
Inspect 2nd sewer service connection Darrel Carter is onsite ###-#### Phone #: ###-#### Inspection requested via web by Mike Basabe 4" service from new stub to existing.
|
Water and/or Sewer | 7/24/2018 | 7/25/2018 | 7/25/2018 | P | PART |
Dan Ediger
|
|
|
Sewer only. 2 sewer services, one new and one existing. Darrel Carter is onsite contact Phone #: ###-#### Inspection requested via web by Mike Basabe. Sewer off of the gym is appoved. The grease intercepter is set needs 24hr test and vented. Vent by plumber per excavator.
|