Final | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | PASS |
Matt Wrobel
|
|
|
Breaker lockout is in place now. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Final | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Taylor wh needs a disconnect or lockable breaker in panel everything else ok
|
Pressure Test | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Daryl Spivey
|
|
|
Ready now. Stub on south side. Phone #: ###-#### Inspection requested via web by Ben Taylor 60 lb test ok.........ds
|
Plumbing Rough-in | 9/25/2018 | 9/28/2018 | 9/28/2018 | A | PASS |
Daryl Spivey
|
|
|
Waste/vent, water, roof drains. Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Groundwork | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PART |
Bill VanDegrift
|
|
|
24 hour interceptor test AM to AM Phone #: ###-#### Inspection requested via web by Ben Taylor start 24 hour interceptor test
|
Groundwork | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | CANC |
Dan Ediger
|
|
|
Interceptor piping and sewer tie in Phone #: ###-#### Inspection requested via web by Ben Taylor. sewer and tank piping ok. 24hr tank test required
|
Groundwork | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Bill VanDegrift
|
|
|
Sewer and shop drains inside foundation Phone #: ###-#### Inspection requested via web by Ben Taylor gw ok
|
Water and/or Sewer | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PART |
Eric Strole
|
|
|
Replaced pvc water line with poly from meter to inside building. Phone #: ###-#### Inspection requested via web by Ben Taylor-Water line pass.
|