Final | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Matt Wrobel
|
|
|
Leroy the homeowner will be home for access. Final of basement bathroom tub/shower, toilet and lavatory basin. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM-Aging Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 6/3/2019 | 6/3/2019 | 6/3/2019 | | PART |
Eric Strole
|
|
|
No calls
|
Plumbing Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Eric Strole
|
|
|
Rough in ready and under test. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Groundwork | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Eric Strole
|
|
|
Sewer tie in at basement/Exterior for new plumbing. Exterior clean out and backwater valve. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Groundwork | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Eric Strole
|
|
|
Groundwork is ready and under test with the exception of the backwater valve and exterior work. Wanting to get other trades going. Thanks. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Other | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | DONE |
Eric Strole
|
|
|
Need to discuss options for venting an ejector pump in a basement remodel. Existing finished basement ceiling creating issues (wood) Hasib is contact Phone #: ###-#### Inspection requested via web by Scott Sparrell-Need to gravity drain basement bath.
|