Final | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Daryl Spivey
|
|
|
Seth Phone #: ###-####
|
Plumbing Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | P | PART |
Daryl Spivey
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER rough in for restroom ok...........need plan on use of passive grease trap installed...........ds
|
Groundwork | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | FAIL |
Dan Ediger
|
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1. Provide an approved set of plans showing all the plumbing. 2. Expose the water service to the meter and install a tracer wire before inspection.
|
Groundwork | 11/12/2018 | 11/13/2018 | 11/12/2018 | P | CANC |
Daryl Spivey
|
|
|
MARCUS IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Groundwork | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PART |
Daryl Spivey
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER outside sewer tie in ok for cover........ds
|