Final | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Matt Wrobel
|
|
|
if questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PART |
Matt Wrobel
|
|
|
if questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann R.P. s and Premis protection need certified
|
Med/Gas Systems | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Matt Wrobel
|
|
|
24 hour test ok
|
Med/Gas Systems | 2/27/2019 | 2/28/2019 | 2/28/2019 | A | PART |
Matt Wrobel
|
|
|
med gas pressure test. if questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann start 24 hour test
|
Plumbing Rough-in | 1/7/2019 | 1/7/2019 | 1/7/2019 | A | PART |
Matt Wrobel
|
|
|
call Efrain ###-#### with questions Inspection requested via web by Stacia Haumann bathroom and breakroom o.k. to cover
|
Groundwork | 12/17/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Matt Wrobel
|
|
|
24hr med gas pressure test, re-inspect med gas in continuous conduit. call Efrain ###-####461 with questions Inspection requested via web by Stacia Haumann
|
Groundwork | 12/13/2018 | 12/14/2018 | 12/14/2018 | P | PART |
Matt Wrobel
|
|
|
groundwork, med gas pressure test. if questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann press test started pipes need to be in a conduit under slab
|