Final | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Eric Strole
|
|
|
0124 enter Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 2/8/2019 | 2/11/2019 | 2/11/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes-Need to be 6" above flood level rim before going horizontal on vent. Need to be 6" above flood level rim before tieing vents together & missing nailplates.
|
Groundwork | 1/8/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Eric Strole
|
|
|
JOB # 20149 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|