Final | 6/10/2019 | 6/12/2019 | 6/12/2019 | A | PASS |
Eric Strole
|
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Eric Strole
|
|
|
JOB CONTACT - RUSSELL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Pool equipment needs to indirect into a floor sink, cannot tie directly into builbing drain. Need to finish all trim. RPBA for pool water needs tested.
|
Groundwork | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | CANC |
Eric Strole
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Water and/or Sewer | 4/5/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Eric Strole
|
|
|
Water service pass.
|
Plumbing Rough-in | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PART |
Eric Strole
|
|
|
DOUG IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to tent all waterlines in attic space & pool equipment needs to indirect into a floor sink, cannot tie directly into builbing drain.
|