Final | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker
|
Plumbing Rough-in | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker
|
Plumbing Rough-in | 3/3/2019 | 3/4/2019 | 3/4/2019 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Decker. 1. Install a cleanout on the 1-1/2" cross at the lavs. 2. Install a backwater valve on the basement fixtures. 3. The basement shower and wc vent? 4. The upstairs hall bath wc is 's" trapped.
|