Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Daryl Spivey
|
|
|
Brian Phone #: ###-####
|
Final | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Daryl Spivey
|
|
|
brian Phone #: ###-#### need tempering devices installed on lavs as required ISPC 407.3...........ds
|
Other | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Daryl Spivey
|
|
|
Manny- Conference -please call prior Phone #: ###-#### some confusion on restroom layout.......
|
Plumbing Rough-in | 4/15/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Daryl Spivey
|
|
|
Please call ###-#### when your on the way out. Thank you Phone #: ###-#### Inspection requested via web by Brian Hughes
|
Groundwork | 3/6/2019 | 3/6/2019 | 3/6/2019 | A | PASS |
Daryl Spivey
|
|
|
We have 1 trench inside the mens restroom, where we installed a new ABS drain line for the future drinking fountain. We need to get this approved before we can proceed with the rough in job Phone #: ###-#### Inspection requested via web by Brian Hughes
|