Final | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Matt Wrobel
|
|
|
Casey Phone #: ###-####
|
Card not on site to sign | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Matt Wrobel
|
|
|
Casey Phone #: ###-####
|
Final | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | FAIL |
Dan Ediger
|
|
|
Casey Phone #: ###-#### 1. Provide an air-gap on the t&p drain. 2. Install a hot water circ system and insulate per plans. 3. Install an expansion tank per plans
|
Plumbing Rough-in | 4/28/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by casey lattimer
|
Groundwork | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by casey lattimer
|