Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Daryl Spivey
|
|
|
Jim Phone #: ###-####
|
Water and/or Sewer | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | NR |
Daryl Spivey
|
|
|
conference only
|
Water and/or Sewer | 4/8/2020 | 4/8/2020 | 4/8/2020 | P | NR |
Daryl Spivey
|
|
|
work to be completed at a later date......ds
|
PLM-Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 | | PEND |
Daryl Spivey
|
|
|
Called Tim and Still have work on sched to do but not till june when school demo starts......ds
|
Water and/or Sewer | 12/4/2019 | 12/5/2019 | 12/4/2019 | A | PART |
Daryl Spivey
|
|
|
water service tested ok...........added water,G/I and storm to permit description...........ds
|
Water and/or Sewer | 12/4/2019 | 12/5/2019 | 12/4/2019 | A | PASS |
Daryl Spivey
|
|
|
Tim Phone #: ###-####
|
Roof Drains | 11/15/2019 | 11/18/2019 | 11/18/2019 | P | PART |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### all except east end drain............marked on plan.........ds
|
Storm Drains | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | PART |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### south and east sides tested........ds
|
Water and/or Sewer | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### 24 HR TEST ON g/i IS OK FOR COVER.........DS
|
Water and/or Sewer | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PART |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### start 24 hr on G/I and tested outlet side piping ok..........ds
|
Plumbing Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | CANC |
Daryl Spivey
|
|
|
Tim Phone #: ###-####
|
Water and/or Sewer | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PART |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### sewer tap and 60 ft of pipe........
|
Water and/or Sewer | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Daryl Spivey
|
|
|
sewer // Tim Phone #: ###-#### short sewer line ok to cover..........ds
|
Water and/or Sewer | 4/18/2019 | 4/19/2019 | 4/18/2019 | P | CANC |
Daryl Spivey
|
|
|
sewer // Tim Phone #: ###-####-Tim called and cancelled
|