Final | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Eric Strole
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Sabrina Amidon
|
PLM-Aging Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/7/2020 | 2/7/2020 | 2/7/2020 | | PART |
Eric Strole
|
|
|
|
Water and/or Sewer | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Eric Strole
|
|
|
water // Clay Phone #: ###-####-Test on waterline & interceptor pass.
|
Water and/or Sewer | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PART |
Eric Strole
|
|
|
water // Clay Phone #: ###-####-Ok to cover waterline, slill need to test. Start of 24 hr test on interceptor.
|
Storm Drains | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Eric Strole
|
|
|
storm drains // Clay Phone #: ###-####-Test on storm drains pass.
|
Other | 11/4/2019 | 11/4/2019 | 11/4/2019 | A | FAIL |
Eric Strole
|
|
|
interceptor // Clay Phone #: ###-####-Test on interceptor fail.
|
Plumbing Rough-in | 11/1/2019 | 11/4/2019 | 11/4/2019 | A | CANC |
Eric Strole
|
|
|
late am, storm drain - interceptor // Clay Phone #: ###-####
|
Water and/or Sewer | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PART |
Eric Strole
|
|
|
storm drain // Clay Phone #: ###-####-Storm drains ok to cover, still need to be tested.
|
Water and/or Sewer | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Eric Strole
|
|
|
midmorning // Clay Phone #: ###-####-Test on sewer pass.
|