PLM-Aging Inspection | 7/30/2020 | 7/30/2020 | 7/30/2020 | | PART |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 4/30/2020 | 4/30/2020 | 4/30/2020 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 1/30/2020 | 1/30/2020 | 1/31/2020 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Eric Strole
|
|
|
Mark Phone #: ###-####
|
Plumbing Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | FAIL |
Matt Wrobel
|
|
|
Mark Phone #: ###-#### 1. n bathroom need co in water closet line 2. no test on n bathroom rough 3. tie in kit drain seperatly or add cleanout in 2 inch line 4. s bathroom needs fullsize c.o. above floor
|
Plumbing Rough-in | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | CANC |
Eric Strole
|
|
|
Mark Phone #: ###-####
|
Plumbing Rough-in | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PART |
Eric Strole
|
|
|
Mark-partial Phone #: ###-####-Water pass.
|
Plumbing Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PART |
Eric Strole
|
|
|
Mark Phone #: ###-####-Trunkline thru crawl pass.
|
Plumbing Rough-in | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | FAIL |
Eric Strole
|
|
|
Mark Phone #: ###-####-Need to grade building drain $ can only have 1 hoseclamp connection in crawl & need 2 hoseclamps on each connection.
|
Final | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | CANC |
Eric Strole
|
|
|
Mark Phone #: ###-####
|