Sprinkler (Final) | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Niecko
|
Sprinkler (Final) | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PART |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Niecko backflow needs certified
|
Sprinkler (Final) | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Niecko-OK to cover, pvb needs tested.
|
Sprinkler (Final) | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ryan Niecko Inspection cancelled from web by: Ryan Niecko
|