Final | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Eric Strole
|
|
|
Please call Dave for any questions, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Final | 7/16/2020 | 7/20/2020 | 7/20/2020 | P | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-All backflows need tested & need to finish labeling non-potable water.
|
Plumbing Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Roof drain pass.
|
Plumbing Rough-in | 5/15/2020 | 5/15/2020 | 5/15/2020 | P | PART |
Daryl Spivey
|
|
|
Please call/text Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum 60 lb gas test ok.......ds
|
Plumbing Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section of non-potable water & vents pass.
|
Plumbing Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, he is prepared to video call if needed, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Clean room vents & vents for fuel interceptor vents pass. Need letter from engineer with calculations showing that a 2" rpba is sufficient for building or summit a plan mod.
|
Plumbing Rough-in | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Eric Strole
|
|
|
Office area except roof drains pass.
|
Water and/or Sewer | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 3/13/2020 | 3/16/2020 | 3/16/2020 | P | CANC |
Eric Strole
|
|
|
Plumbing Rough-in Inspection. Please call prior to arrival. Dave: ###-####.Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Plumbing Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PART |
Eric Strole
|
|
|
Plumbing Rough-in Inspection. Please call prior to arrival. Dave: ###-####.Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Need to fix reverse grade on vents & drain& backwards santee.
|
PLM-Aging Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | PART |
Eric Strole
|
|
|
wip
|
Groundwork | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Groundwork | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | FAIL |
Dan Ediger
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum 1. Piping in and out of the interceptor ok. 2. A plumbing permit is required for the installation of the interceptor. 3. A water 24 hour water test is required for the interceptor including all sides exposed
|
Groundwork | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PART |
Matt Wrobel
|
|
|
Please call Dave at least 30 min prior to inspection, thank you!! Phone #: ###-#### Inspection requested via web by Rhonda Marcum floor sinks east end pass
|
Groundwork | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete pass.
|
Groundwork | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Water service sub into & out of building pass.
|
Groundwork | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave 30 minutes prior to arrival. Dave: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 8/19/2019 | 8/20/2019 | 8/20/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PART |
Dan Ediger
|
|
|
Please call Dave at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum main 4" drain from grid line 9 on gl F. risors
|
Groundwork | 7/11/2019 | 7/12/2019 | 7/12/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave before arriving and with any questions you may have. Dave ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave before arriving and with any questions you may have. Dave ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PART |
Eric Strole
|
|
|
Please call Dave before arriving and with any questions you may have. Dave ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Section complete is marked on plans.
|
Groundwork | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PART |
Eric Strole
|
|
|
Please call Dave before arriving and with any questions you may have. Dave ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum-This was a conferance.
|