Final | 7/2/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Final | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PASS |
Matt Wrobel
|
|
|
|
PLM-Aging Inspection | 5/15/2020 | 5/15/2020 | 5/15/2020 | | PART |
Matt Wrobel
|
|
|
wip
|
Plumbing Rough-in | 1/24/2020 | 1/27/2020 | 1/27/2020 | A | PASS |
Matt Wrobel
|
|
|
1st floor clean outs Phone #: ###-#### Inspection requested via web by Raul Castanon cleanouts have been turned and or raised up. recomended measuring and documenting all co s for use in future
|
Plumbing Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Matt Wrobel
|
|
|
First floor water and main line and pressure test Phone #: ###-#### Inspection requested via web by Raul Castanon all 3 floors water pass spoke with raul about cleanouts thast were too low or non accessable he will have to fix 3rd floor covered before test was witnessed
|
Plumbing Rough-in | 1/15/2020 | 1/17/2020 | 1/17/2020 | A | NR |
Dan Ediger
|
|
|
1st fllor Phone #: ###-#### Inspection requested via web by Raul Castanon all cleanouts must be accessible in accordance with code. test not ready
|
Plumbing Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PART |
Eric Strole
|
|
|
2nd floor Phone #: ###-#### Inspection requested via web by Raul Castanon-2nd flr water ok, still needs tested.
|
Plumbing Rough-in | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PART |
Matt Wrobel
|
|
|
DWV all bldg and 3rd floor water Phone #: ###-#### Inspection requested via web by Raul Phone #: ###-#### Inspection requested via web by Raul Castanon 1 dwv pass water still needs to be finished and tested
|
Groundwork | 8/14/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon leak fixed per phone call
|