Final | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Matt Wrobel
|
|
|
if questions call Lynn @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Matt Wrobel
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann all rough and roof drains are now passed ok to cover
|
Plumbing Rough-in | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Matt Wrobel
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 1st floor waste and wall waters, overhead wayer mains ok to cover floor waste not inspected no cover for ceiling
|
Groundwork | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Matt Wrobel
|
|
|
if questions call Josh @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|