Final | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Daryl Spivey
|
|
|
Building will be unlocked. Any issues please call number above Phone #: ###-#### Inspection requested via web by Dustin Sacolick
|
Final | 4/30/2020 | 5/1/2020 | 5/1/2020 | P | FAIL |
Daryl Spivey
|
|
|
It will be unlocked at time of arrival. If any issues please call number above Phone #: ###-#### Inspection requested via web by Dustin Sacolick test dcva and tempered water to lavs is required.......ds
|
Plumbing Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Sacolick
|
Water and/or Sewer | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Daryl Spivey
|
|
|
No meter set just 1” poly to building with one connection at meter. Phone #: ###-#### Inspection requested via web by Dustin Sacolick water serv ok.........ds
|
Groundwork | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Sacolick
|
Groundwork | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | FAIL |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Sacolick vent floor drains as required by ISPC.........ds
|