Plumbing Rough-in | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Eric Strole
|
|
|
please call brandon prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige-Mothers room 222G, Lav walls in mens room 200Q & womens 200P pass.
|
Plumbing Rough-in | 8/11/2020 | 8/13/2020 | 8/13/2020 | A | CANC |
Eric Strole
|
|
|
please call brandon prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Plumbing Rough-in | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PART |
Eric Strole
|
|
|
please contact jake prior to arrival for access. Phone #: ###-#### Inspection requested via web by Nicholas Paige-Relocation of vent pass.
|
Final | 5/18/2020 | 5/19/2020 | 5/19/2020 | P | PART |
Eric Strole
|
|
|
1st floor partial final. please call Jake prior to arrival for access. Phone #: ###-#### Inspection requested via web by Nicholas Paige-1st floor phase 1 temp final ok.
|
Final | 5/7/2020 | 5/11/2020 | 5/11/2020 | A | PART |
Eric Strole
|
|
|
this is a partial Final. 2nd floor. please contact Jake prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige-2nd floor phase 1 temp final ok.
|
Roof Drains | 2/25/2020 | 2/26/2020 | 2/26/2020 | P | PART |
Eric Strole
|
|
|
Please call Brandon prior to arrival to arrange access.
thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige-Phase 1 Area A Roof drains up to vertical section that will continue thru roof at a later date pass. Ok to insulate this section.
|
Roof Drains | 2/25/2020 | 2/26/2020 | 2/25/2020 | A | CANC |
Eric Strole
|
|
|
Please call Brandon prior to arrival to arrange access.
thanks Phone #: ###-#### Inspection requested via web by Nicholas Paige-Changed to a PM inspection.
|
Plumbing Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Eric Strole
|
|
|
please call Brandon Prior to arrival for access
Phone #: ###-#### Inspection requested via web by Nicholas Paige-Phase 1 existing bathrooms pass. Due to the limited amount of work on the DWV and all the existing DWV a running test was adequate.
|
Plumbing Rough-in | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PART |
Eric Strole
|
|
|
please call Brandon prior to arrival for access Phone #: ###-#### Inspection requested via web by Nicholas Paige-Phase 1 rough-in pass.
|
Plumbing Rough-in | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige-Phase 1 restrooms back to breakroom sink water pass.
|
Plumbing Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | P | PART |
Eric Strole
|
|
|
please call Brandon Paige 30m min prior to arrival for access and escort Phone #: ###-#### Inspection requested via web by Nicholas Paige-Area 1A in wall coffee bar pass.
|
Plumbing Rough-in | 12/12/2019 | 12/13/2019 | 12/12/2019 | P | CANC |
Eric Strole
|
|
|
Please call Brandon 30 min prior to arrival for access and escort. Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|
Groundwork | 12/6/2019 | 12/7/2019 | 12/7/2019 | A | PART |
Eric Strole
|
|
|
Dorian requested an after hours inspection. ###-#### Call the inspector for time. As early as possible .Level 1 Segment A ground work pass.
|
Groundwork | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Eric Strole
|
|
|
Dorian requested an after hours inspection. ###-#### Call the inspector for time. As early as possible.-Ok to cover as long as test is holding for inspection on Saturday.
|
Groundwork | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | PART |
Eric Strole
|
|
|
Partial Underground Inspection. Contact Brandon Prior to arriving for access. Phone #: ###-#### Inspection requested via web by Nicholas Paige-Area 1A coffee bar to restroom 100W pass.
|
Other | 11/22/2019 | 11/25/2019 | 11/25/2019 | P | DONE |
Eric Strole
|
|
|
conference on inspection process on underground piping. please call brandon (###-####) or jimmy (###-####) to discuss or with access issues. they are onsite. Phone #: ###-#### Inspection requested via web by Nicholas Paige-Conferance.
|