Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PASS |
Eric Strole
|
|
|
|
Pressure Test | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Williams-60 lb gas test pass.
|
Final | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Williams
|
Final | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Williams-Need to resubmit plans for change to gas piping from approved plans. Need gas load calculations that are on gas line on new drawings. Will need to test gasline. If testing againt live system need two gas valves with open tee in the middle.
|
Pressure Test | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | FAIL |
Eric Strole
|
|
|
guage is located in unit 113 in ceiling Phone #: ###-#### Inspection requested via web by Jason Williams-Gas piping is not per the approved plans. See plans page P1.1 Key notes 13 & 14.
|