Final | 3/16/2020 | 3/18/2020 | 3/18/2020 | A | PASS |
Eric Strole
|
|
|
Please call Rick when you are on your way, before arriving, and allow 15 minutes for Rick to show up. Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | NH |
Eric Strole
|
|
|
Please call our technician Rick @ ###-#### when en route. The downstairs lav and toilet will not be set until the flooring is complete, which is possibly two months from now. Phone #: ###-#### Inspection requested via web by Rusty Karel-No access, left notice.
|
Plumbing Rough-in | 1/3/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Matt Wrobel
|
|
|
Please call our technician Andy when en route @ ###-####. This is for the plumbing rough-in for a bathroom and a washer box Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Plumbing Rough-in | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | CANC |
Eric Strole
|
|
|
Please call Christian Alcorn when en route @ ###-#### Phone #: ###-#### >> Inspection requested via web by Rusty Karel // called to cancel 1/3/2020 GDB
|
Plumbing Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | CANC |
Eric Strole
|
|
|
Please call technician Rick when en route at ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Groundwork | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Eric Strole
|
|
|
Please call technician Rick when en route at ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Plumbing Rough-in | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Eric Strole
|
|
|
Please call our technician Rick when en route @ ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel-Need backwater valve and need to vent flr sink & roll y on vent for tub & dwv test fail/
|
Plumbing Rough-in | 12/3/2019 | 12/6/2019 | 12/4/2019 | A | CANC |
Eric Strole
|
|
|
Please call Chrstian Alcorn @ 1-###-#### when en route Phone #: ###-#### >> Inspection requested via web by Rusty Karel Inspection cancelled from web by: Rusty Karel
|