Final | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | PASS |
Eric Strole
|
|
|
Key is in electric box left of door Phone #: ###-#### Inspection requested via web by Robert Goodson
|
Plumbing Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson
|
Plumbing Rough-in | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson-Need to equal cross secional venting. Vents going thru backwater valve do not count.
|
Groundwork | 1/14/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Eric Strole
|
|
|
|
Groundwork | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by robert goodson-Need backwater valves.
|