Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Dan Ediger
|
|
|
Garage code 2805 Phone #: ###-#### Inspection requested via web by Troy Woolston
|
Groundwork | 4/1/2020 | 4/2/2020 | 4/2/2020 | A | PASS |
Daryl Spivey
|
|
|
Groundwork for shop in rear of property. Toilet, utility sink, floor drain Phone #: ###-#### Inspection requested via web by Troy Woolston
|
Plumbing Rough-in | 3/15/2020 | 3/16/2020 | 3/16/2020 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Troy Woolston
|
Groundwork | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Daryl Spivey
|
|
|
The garage drain has a sand catch bucket that goes in it. Thanks! Phone #: ###-#### Inspection requested via web by Troy Woolston
|