Final | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Eric Strole
|
|
|
keys are in vent between units. if you have questions contact Ron @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PASS |
Eric Strole
|
|
|
if questions call Eric @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | FAIL |
Eric Strole
|
|
|
if questions call Brandon ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann-Fixtures going thru backwater valve do not count for cross sectional venting. Need to equal cross sectional venting for house.
|
Groundwork | 3/26/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Eric Strole
|
|
|
if questions call Tom @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|