Information based on query as of Saturday, September 28, 2024.
Permit Information
Permit NumberBLD00-02093
StatusFinaled
Name BOISE CITY
Site Address 3131 HARVARD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(SPLAT PAINT BALL FUN) This building is not fire sprinklered. To prepare a former warehouse building (13,013 square feet) for use as a paintball playing field. Dirt will be put on the floor and props constructed. The props will be from 4 feet to 5 feet tall. The means of egress shall always be apparent and shall not be disguised by theatrical distractions, low lighting levels, or physical obstructions. CUP00-00047 PC-578-00 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Review Report  3/11/2015  
Case Summary (BLD)  3/11/2015  
Case Summary (BLD)  2/3/2015 DONE
DetailsSam Zahorka
Case Summary (BLD)  2/3/2015 DONE
Fee Review-notes7/19/20007/19/20005/9/2001 DONE
Permanent occupancy  5/1/2001 DONE
Perm. Occ. Cert. #8656 issued 5-1-01 to Splat Paintball Fun.
BLD-Final4/25/20014/26/20014/26/2001APASS
DetailsJim Storey
FN OCC ###-#### - TROY--CALL 1ST BEFORE INSP
FIRE-Final Inspection4/25/20014/26/20014/26/2001APASS
DetailsRick Jackson
FIRE FN TROY -###-####--CALL 1ST BEFORE INSP
Permanent Occupancy 4/25/20014/25/2001 DONE
Details
Code Occupancy Approval  4/25/2001 PASS
NO REAL REQUIREMENTS FOR THIS LOT FOR PLANNING, DRIVEWAY IN PLACE AND ALL REMAINING IS GRAVEL PARKING, FINAL SIGNED OFF.
Issue PAID IN FULL permit  2/16/2001 DONE
CHANGE ISSUED DATE  2/16/2001  
Routing - PLAN CHECK2/7/2001 2/8/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/8/2001 PASS
Inspection Record Card- Bld  2/8/2001 DONE
Print Occupancy Form  2/8/2001 DONE
Telephone call  2/8/2001 DONE
LEFT MESS THAT PERMIT IS READY & NEEDED ACHD
Plan assigned to (CJW)7/24/2000 2/8/2001 PASS
DetailsCarl Westfall
2/8/01 10:16:03 CJW - activity updated through activity BLDA022 from case BLD00-02093.
Routing - FIRE2/1/2001 2/7/2001 PASS
2/5-No water data, requested from owner and United Water.
2/7 - received water info from UW.
Routing - PLAN CHECK10/11/2000 2/1/2001  
Hydrant information submitted. Sent back to Fire.
Plan resubmittals received  1/31/2001 DONE
Received three copies of fire hydrants sheets. Routed to Carl W. KMM
Routing - FIRE10/11/2000 10/11/2000  
DetailsBill Alexander
Failed 2nd UFC review. Still lack hydrant locations and verification of required fire flows.
Routing - FIRE8/10/2000 8/15/2000  
DetailsBill Alexander
Failed first UFC review. Hydrant location, water flow requirement, access issues all per UFC.
Plan Review Completed(1st rev)  8/15/2000  
Failed first UFC review.
Routing - PLAN CHECK8/7/2000 8/10/2000 PASS
Plan Reviewer's activity  8/8/2000 PASS
UBC plan review started August 8, 2000 and finished August 10, 2000. The drawings were approved with conditions. See the conditions list.
Routing - PUBLIC WORKS7/25/2000 8/7/2000 PASS
Routing - PLANNING7/24/2000 7/25/2000 PASS
Pending Assignment by MYS7/24/2000 7/24/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  7/24/2000 DONE
Route to PLANNING, PUBLIC WORKS, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  7/20/2000 DONE
Received Certificate of Value  7/19/2000 DONE
Application received  7/19/2000  
Recd Pcfee & Taken To Pln CK  7/19/2000 DONE
Routing - PLAN CHECK8/16/2000