BLD-Final | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Jim Sly
|
|
|
kendale ###-#### C/C issued 8/31/2001 1:50:04 PM
|
DOC - Permit Finaled | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 8/31/2001 1:50:14 PM
|
BLD-Conference | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | PART |
Jim Sly
|
|
|
###-#### Modify stairs so center of landing (approx) 20" measures 36" (to angle) at direction of travel. 8/16/2001 12:19:59 PM
|
BLD-Framing/Rough-in | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | PART |
Tom Arcoraci
|
|
|
shear wall insp kendall ###-#### STAIRS INCOMPLETE 7/16/2001 1:46:27 AM 7/16/2001 1:46:47 AM
|
BLD-Framing/Rough-in | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PART |
Jim Sly
|
|
|
###-#### OK to rock.....Owner to install stairway after sheetrock....C/N for insp of stairway During and immediatly after building......Not at final! C/N Need insp of Int. shear panels. 7/13/2001 10:49:17 AM
|
BLD-Energy code compliance | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | FAIL |
Jim Sly
|
|
|
reinspection kendall ###-#### C/N on site. 6/29/2001 11:48:57 AM
|
BLD-Framing/Rough-in | 6/28/2001 | 6/29/2001 | 6/29/2001 | P | FAIL |
Jim Sly
|
|
|
kendall ###-####
|
BLD-Framing/Rough-in | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | FAIL |
Jim Sly
|
|
|
fr kendall-- ###-#### C/N for siding W/O authorization 6/21/2001 11:35:11 AM
|
BLD-Conference | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PART |
Jim Sly
|
|
|
conference on framing Kendal ###-#### Discussed shear. 5/16/2001 11:17:59 AM
|
BLD-Footing | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Jim Sly
|
|
|
###-#### Wall OK 4/4/2001 1:26:15 PM
|
BLD-Footing | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PART |
Jim Sly
|
|
|
J R Polson ###-####
|
Issue PAID IN FULL permit | | | 3/26/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2001 | | DONE |
|
|
|
|
CHANGE STATUS TO (PND) | | | 2/12/2001 | | DONE |
|
|
|
steve took the plans back because he wanted too
|
Inspection Record Card- Bld | | | 10/10/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2000 | | DONE |
|
|
|
called permit ready and they said they would resubmit in 1 or 2 days. He has some modifications. I will let Steve know.
|
Plan assigned to (SAM) | 9/25/2000 | | 10/9/2000 | | PASS |
Steve Munroe
|
|
|
10/9/2000 15:50:12 SAM - activity updated through activity BLDA022 from case BLD00-02579.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2000 | | DONE |
|
|
|
|
Pending Assignment by DJO | 8/30/2000 | | 9/25/2000 | | DONE |
Dan Overy
|
|
|
9/25/2000 14:39:05 SAM - activity updated through activity BLDA183 from case BLD00-02579.
|
Routing - PUBLIC WORKS | 8/30/2000 | 8/30/2000 | 8/31/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 8/30/2000 | 8/30/2000 | 8/31/2000 | | PASS |
|
|
|
|
Application received | | | 8/30/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 8/31/2000 | 8/31/2000 | | | PEND |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan resubmittals received | | | | | PEND |
|
|
|
2/12/01 Builder brought in a new set of plans to replace the approved set of plans. I talked to the builder and he said the developer required a larger residence on the property.
|
Case Summary (BLD) | | | | | |
|
|
|
|