Permit Information
Permit NumberBLD00-02926
StatusFinaled
Name TRUS JOIST CORPORATION
Site Address 2910 E AMITY RD
Project NameTRUS JOIST-DUST COLLECT
Customer Number 
ePlanReviewNo
Description
TO INSTALL DUST COLLECTION EQUIPMENT, SUPPORTED BY A CONCRETE FOUNDATION AND STEEL FRAME, ON THE WEST SIDE OF THE TRUS JOIST MACMILLIAN TECHNOLOGY CENTER BUILDING, AS WELL AS, TO INSTALL RELATED INTERIOR ELEVATED DUCT WORK FOR COLLECTING AND CONVEYING SAWDUST FROM EACH OF THE PROPOSED PIECES OF WOODWORKING EQUIPMENT TO THE NEW EXTERIOR DUST COLLECTOR. ALL CONSTRUCTION PER THE APPROVED PLANS AND SPECIFICATIONS ON FILE. DRH00-00190/00-804/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/6/2001 DONE
Letter of Compliance #21353 issued 3-6-01.
BLD-Final3/2/20013/5/20013/5/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/02/2001 at 12:54:11. Contact: ###-####.
FIRE-Final Inspection2/26/20012/27/20012/27/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/26/2001 at 09:36:35. Contact: ###-####. need to test the alarms and sprinklers 2/27/2001 2:14:50 PM
BLD-Final2/1/20012/2/20012/2/2001ANR
DetailsSteven Webb
Scheduled by a contractor via Hello! on 02/01/2001 at 16:41:59. Contact: ###-####. Talked to john at T.J. additional signatures needed prior to final sign off. 2/2/2001 9:08:26 AM
BLD-Framing/Rough-in12/20/200012/20/200012/20/2000APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/20/2000 at 06:58:33. Contact: ###-####.
Plan resubmittals received  11/14/2000  
THREE COPIES PLAN CHANGE BULLETIN NO 3/ REVISE LOCATION OF DUST COLLECTION EQUIPMENT PER REVISED PLANS. RECEIVED THREE COPIES OF SHEETS A-1.4, A-3.1, 1DU, 2DU, 3DU. ROUTED TO Russ Owen PER JOHN M. KMM
Plan resubmittals received  10/31/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS A-1.4, A-3.1, S1, M-1, E2.4A, FROM BRS. ROUTED TO RUSS OWEN. KMM
Issue PAID IN FULL permit  10/24/2000 DONE
Routing - FIRE10/17/200010/20/200010/20/2000 PASS
DetailsBill Alexander
Plan assigned to (JCM)10/7/2000 10/20/2000 PASS
DetailsJohn Menard
10/20/00 10:38:31 JCM - activity updated through activity BLDA022 from case BLD00-02926.
Plan Review Completed(1st rev)  10/20/2000 PASS
Routing - PLAN CHECK10/20/2000 10/20/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/20/2000 PASS
Print Occupancy Form  10/20/2000 DONE
Inspection Record Card- Bld  10/20/2000 DONE
Inspection Record Card- Bld  10/20/2000 DONE
Telephone call  10/20/2000 DONE
called permit ready
Inspection Record Card- Bld  10/20/2000 DONE
Telephone call  10/20/2000 DONE
Marv from Russell Corp called they are no longer the general on the project Trus Joist is going to do their own work so I recalled John Laz at ###-#### or ###-#### and gave him permit information.
Plan Reviewer's activity  10/17/2000 PASS
PLANS AND SPECIFICATIONS REVIEWED AND APPROVED AS SUBMITTED.
Routing - PLAN CHECK10/9/2000 10/17/2000 PASS
Routing - PLANNING10/7/2000 10/9/2000 PASS
Please see approval in DRH00-190
Plans ACCEPTED BY PLAN TECH  10/2/2000 DONE
Application received  9/28/2000  
Recd Pcfee & Taken To Pln CK  9/28/2000 DONE