Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD00-03639
StatusFinaled
Name URBAN RENEWAL AGENCY OF BOI SE
Site Address 1276 W RIVER ST
Project NameRIVER PLAZA-1ST FLR
Customer Number 
ePlanReviewNo
Description
To construct a 6,540 sq.ft. office tenant on the 1st floor per approved plans on file. This tenant is finishing the first floor. Work to include installation of interior walls, electrical, and HVAC system and finish. NOTE: This building is fully fire sprinklered for 1-hr. fire resistive substitution. MJP (P.C.#1047-00)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes12/15/200012/15/200011/9/2001 DONE
BLD-Final7/12/20017/13/20017/13/2001APASS
DetailsCarl Dependahl
###-####
Permanent Occupancy 7/13/20017/13/2001 DONE
Details
Permanent occupancy  7/13/2001 DONE
Perm. Occ. Cert. #8761 issued 7-13-01 to United Way of Treasure Valley.
BLD-Aging Inspection6/18/20016/18/20016/18/2001 PASS
DetailsCarl Dependahl
need all shell items 6/18/2001 9:16:12 AM
BLD-Final4/16/20014/16/20014/16/2001PNR
DetailsCarl Dependahl
###-####, need shell finalled prior to c/o...may extend temp if need 1 time 4/16/2001 3:25:45 PM
BLD-Final3/13/20013/13/20013/13/2001PFAIL
DetailsCarl Dependahl
###-####, complete draft stops; ok for t/o 3/13/2001 6:19:25 PM
FIRE-Final Inspection3/13/20013/13/20013/13/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 3/13/2001 11:53:16 AM
FIRE-Final Inspection3/12/20013/12/20013/12/2001AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 3/12/2001 8:23:44 AM need sprinkler plans
BLD-Conference3/8/20013/8/20013/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/8/2001 9:21:20 AM need 1hr ext wall at east; complete gyp at 1hr stairs
BLD-Conference3/6/20013/6/20013/6/2001PPASS
DetailsCarl Dependahl
571--0990...c/n re gyp at 1hr stairs 3/6/2001 4:06:48 PM
BLD-Final3/5/20013/5/20013/5/2001PFAIL
DetailsCarl Dependahl
###-####, not final 3/5/2001 6:04:42 PM
BLD-Framing/Rough-in3/5/20013/5/20013/5/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/5/2001 6:06:07 PM part, ok to tile perimeters, pend other insps. Add seismic braces as needed at all rooms over 144 sf.
BLD-Framing/Rough-in2/23/20012/23/20012/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/23/2001 11:16:19 AM KEEP C/N...COMPLETE DRAFT STOP PER DISCUSSION
BLD-Conference2/21/20012/21/20012/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/21/2001 4:46:19 PM need seal draft stop
BLD-Conference1/29/20011/29/20011/29/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 09:33:28. Contact: ###-####. w/ arch & contractors...re c/n. add draft stop, complete gyp at stairs 1/29/2001 3:59:43 PM
BLD-Framing/Rough-in1/25/20011/25/20011/25/2001PFAIL
DetailsCarl Dependahl
united way 1st floor carl ###-#### & tom-- ###-####, c/n fireblocks, draft stops at floor clg; ok to cover steel stud framing only. need complete gyp at stairs. 1/25/2001 4:16:09 PM
Issue PAID IN FULL permit  1/16/2001 DONE
Plan assigned to (M_P)12/19/2000 1/11/2001 PASS
DetailsMike Phillips
1/11/2001 10:05:14 MYS - activity updated through activity BLDA022 from case BLD00-03639.
Routing - PLAN CHECK1/10/2001 1/11/2001 PASS
Signed on behalf of Mike Philllips and took to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  1/11/2001 DONE
Issued on behalf of Mike Phillips.
Inspection Record Card- Bld  1/11/2001 DONE
Print Occupancy Form  1/11/2001 DONE
Telephone call  1/11/2001 DONE
Routing - FIRE  1/10/2001 PASS
Plan Review Completed(1st rev)  1/10/2001 PASS
Plan Reviewer's activity  1/5/2001 PEND
Waiting for others to approved prior to issuance of permit.
Routing - PLAN CHECK12/20/2000 1/5/2001 PEND
Routing to fire.
Plan resubmittals received  1/4/2001 DONE
Plan resubmittals received from Tamura and associates, two sets of A-2.0, A-6.0, A-7.0 and A-10.0, forwarded same to Mike Phillips 1/4/01 DAR
Routing - PUBLIC WORKS12/19/2000 12/20/2000 PASS
Pending Assignment by MYS12/19/2000 12/19/2000 DONE
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  12/15/2000 DONE
Received Certificate of Value  12/15/2000 DONE
Application received  12/15/2000  
Recd Pcfee & Taken To Pln CK  12/15/2000 DONE