Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD01-00606
StatusFinaled
Name PARK APARTMENTS II
Site Address 1047 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "B-6" BUILDING * To construct a new two story, with basement and mezzanines 5,144 sq.ft. wood framed, 12 unit apartment building. The basement is 2,220 sq.ft and has two units @ 562 sq.ft and two units @ 548 sq.ft.each. The first floor is 2,220 sq.ft. and contains two units @ 562 sq.ft. and two units and 548 sq.ft. each. The second floor contains four units @ 615 sq.ft with a 116 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/15/2015 DONE
Permanent Occupancy 6/7/20026/7/2002 DONE
Details
BLD-Final6/7/20026/7/20026/7/2002PPASS
DetailsCarl Dependahl
###-####
Permanent occupancy  6/7/2002 DONE
Perm. Occ. Cert. #9164 issued 6-7-02 to the Park Apartments II.
BLD-Final6/6/20026/6/20026/6/2002PNR
DetailsCarl Dependahl
Cathy has the card
BLD-Final6/3/20026/5/20026/5/2002PNR
DetailsTom Arcoraci
###-####
Fee Review-notes3/14/20013/14/20014/18/2002 DONE
BLD-Final4/9/20024/10/20024/10/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/09/2002 at 16:49:55. Contact: ###-####. complete stair rails (extensions, etc.) obtain other perm finals; ok for t/o 4/10/2002 12:03:26 PM
Temporary occupancy  4/10/2002 DONE
Temp. Occ. #4785 issued 4-10-02 to the Park Apts.
FIRE-Final Inspection4/9/20024/9/20024/9/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/09/2002 at 08:02:13. Contact: ###-####.
BLD-Final4/9/20024/9/20024/9/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/09/2002 at 08:02:50. Contact: ###-####. nr, recall 4/9/2002 5:04:20 PM
Case Summary (BLD)  4/5/2002  
FIRE-Final Inspection3/27/20023/28/20023/27/2002ACANC
DetailsRick Jackson
dave ###-#### fire fn Disp set to [CANC] by a contractor via Hello! on 03/27/2002 at 17:58:59.
BLD-Wall cover1/7/20021/8/20021/8/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/07/2002 at 14:00:31. Contact: ###-####...need eng's/arch ok for 1st fl shear after rock installed. 1/8/2002 10:31:33 AM
BLD-Framing/Rough-in1/8/20021/8/20021/8/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/8/2002 10:25:28 AM reinsp ok, need eng's/arch's ok for 1st floor shear wall construction (nail schedule, configuration.)
BLD-Energy code compliance1/8/20021/8/20021/8/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/8/2002 10:26:27 AM wall insul ok.
BLD-Wall cover1/4/20021/4/20021/4/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/04/2002 at 08:42:07. Contact: ###-####.
BLD-Energy code compliance1/4/20021/4/20021/4/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/4/2002 5:20:32 PM 1st, 2nd fl ok
BLD-Framing/Rough-in1/3/20021/3/20021/4/2002PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/3/2002 6:15:21 PM ###-####
BLD-Wall cover1/3/20021/3/20021/3/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/03/2002 at 09:28:32. Contact: ###-####.
BLD-Framing/Rough-in12/28/200112/31/200112/31/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/28/2001 at 16:17:46. Contact: ###-####.verbal: complete fireblocks, nail off joisting to plates, add headers or justify at int openings by baths, etc. 12/31/2001 1:19:42 PM
BLD-Framing/Rough-in12/12/200112/12/200112/12/2001PPART
DetailsCarl Dependahl
###-####,ext nails 12/12/2001 6:12:31 PM ok 12/12/2001 6:12:51 PM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Aging Inspection11/28/200111/28/200111/28/2001 NR
DetailsCarl Dependahl
wip 11/28/2001 6:06:23 PM
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Aging Inspection9/25/20019/25/20019/25/2001 NR
DetailsCarl Dependahl
Apts, WIP. 9/25/2001 9:09:34 AM
BLD-Foundation7/26/20017/26/20017/26/2001PPASS
DetailsJim Storey
thickened slab ft ok 7/26/2001 1:38:11 PM
BLD-Foundation7/12/20017/13/20017/13/2001APART
DetailsCarl Dependahl
found-- jim ###-#### steel in; cylinders by MTI 7/13/2001 10:02:14 AM
BLD-Conference6/26/20016/26/20016/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/26/2001 11:20:27 AM w/ arch re c/n issued to project
BLD-Footing6/21/20016/25/20016/25/2001PPART
DetailsCarl Dependahl
late pm ###-####
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready for pickup
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 10:09:18 M_P - activity updated through activity BLDA022 from case BLD01-00606.
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. contacted Chad Heimbigner requesting 4 additional copies. KMM
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2. TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3 A5.1, A6.1, A6.2, P-1 FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing Off Site - STRUCTURAL3/15/2001 4/11/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW (DRH00-00239)
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE